Final Decision – Recertification of Penacook Upper Project, LIHI #52, NH
avril 15, 2020Final Decision – Recertification of Gregg’s Falls Project, LIHI #120
avril 17, 2020Lexington MA (April 17, 2020): The decision to certify the Milo Project became final after the close of the appeals period on April 15, 2020 with no appeals filed. The Certification term is from December 18, 2019 – December 17, 2024.
Décision préliminaire – Certification du projet de barrage Wells, en attente LIHI #203, WA
En savoir plus