Complete Application Received – Hailesboro No. 3, No. 4 and No. 6 Projects, NY
février 7, 2023Preliminary Decisions – Certification of Belleville and Meldahl Projects, Pending LIHI #193, #194, OH/WV and OH/KY
février 21, 2023February 9, 2023: The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Monroe Drop Hydroelectric Project owned by Natel Energy and located on the North Unit Irrigation District Main Canal near Culver, OR. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. Please review the program and criteria in LIHI’s revised Manuel et consultez ensuite les documents de candidature du projet ci-dessous.
Comments that are directly tied to specific LIHI criteria (flows, water quality, passage des poissons, etc.) seront très utiles, mais tous les commentaires seront pris en compte. Les commentaires peuvent être soumis à l'Institut par courrier électronique à l'adresse commentaires@lowimpacthydro.org with “Monroe Drop Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476. Comments must be received on or before 5 pm Eastern time on April 10, 2023 à prendre en considération. Tous les commentaires seront publiés sur le site Web et le candidat aura la possibilité d'y répondre. Toute réponse sera également publiée.
Décision préliminaire – Certification du projet de barrage Wells, en attente LIHI #203, WA
En savoir plus