Preliminary Decision – Certification of Willow Island Project, Pending LIHI #187, OH/WV
Décembre 1, 2021Preliminary Decision – Recertification of Benton Falls Project, LIHI #79, ME
Décembre 14, 2021December 8, 2021: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Fall River Rural Electric Cooperative for the Buffalo River Project located on the Buffalo River in Idaho.
Le LIHI sollicite des commentaires sur cette demande. Les commentaires directement liés à des critères spécifiques du LIHI (débits, qualité de l'eau, passage des poissons, etc.) will be most helpful, but all comments will be considered. Comments may be submitted to LIHI by e-mail at commentaires@lowimpacthydro.org with “Buffalo River Project Comments” in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Office 407, Arlington, MA 02476. Comments must be received at the Institute on or before 5 pm Eastern time on February 6, 2022 to be considered. All comments will be posted to the web site and the applicant will have an opportunity to respond. Any response will also be posted.
La description du projet et la candidature complète peuvent être trouvées ICI.
Décision préliminaire – Certification du projet de barrage Wells, en attente LIHI #203, WA
En savoir plus