{"id":4996,"date":"2022-01-21T09:41:09","date_gmt":"2022-01-21T14:41:09","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=4996"},"modified":"2022-01-21T09:41:09","modified_gmt":"2022-01-21T14:41:09","slug":"fifteen-mile-falls-project-lihi-39-complete-application-received","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/zh_cn\/fifteen-mile-falls-project-lihi-39-complete-application-received\/","title":{"rendered":"\u5341\u4e94\u82f1\u91cc\u7011\u5e03\u9879\u76ee\uff0cLIHI #39 \u2013 \u5df2\u6536\u5230\u5b8c\u6574\u7533\u8bf7"},"content":{"rendered":"<p><strong>2022 \u5e74 1 \u6708 21 \u65e5\uff1a <\/strong>\u4f4e\u5f71\u54cd\u6c34\u7535\u7814\u7a76\u6240 (LIHI) \u5df2\u6536\u5230 Great River Hydro \u9488\u5bf9\u4f4d\u4e8e\u65b0\u7f55\u5e03\u4ec0\u5c14\u5dde\u548c\u4f5b\u8499\u7279\u5dde\u5eb7\u6d85\u72c4\u683c\u6cb3\u4e0a\u7684\u5341\u4e94\u82f1\u91cc\u7011\u5e03\u9879\u76ee\u7684\u5b8c\u6574\u91cd\u65b0\u8ba4\u8bc1\u7533\u8bf7\u3002<\/p>\n<p>LIHI \u6b63\u5728\u5f81\u6c42\u5bf9\u6b64\u7533\u8bf7\u7684\u610f\u89c1\u3002\u4e0e\u7279\u5b9a LIHI \u6807\u51c6\uff08\u6d41\u91cf\u3001\u6c34\u8d28\u3001 <span class='tooltipsall tooltip_post_id_5566 classtoolTips59'>\u9c7c\u9053<\/span>\u7b49\uff09\u5c06\u975e\u5e38\u6709\u5e2e\u52a9\uff0c\u4f46\u6240\u6709\u8bc4\u8bba\u90fd\u4f1a\u88ab\u8003\u8651\u3002\u8bc4\u8bba\u53ef\u4ee5\u901a\u8fc7\u7535\u5b50\u90ae\u4ef6\u63d0\u4ea4\u7ed9 LIHI\uff0c\u5730\u5740\u4e3a\u00a0<a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> \u4e3b\u9898\u884c\u4e3a\u201cFifteen Mile Falls \u9879\u76ee\u8bc4\u8bba\u201d\uff0c\u6216\u90ae\u5bc4\u81f3 Low Impact Hydropower Institute\uff0c\u5730\u5740\uff1a1167 Massachusetts Avenue, Office 407, Arlington, MA 02476\u3002 <strong>\u610f\u89c1\u5fc5\u987b\u5728 2022 \u5e74 3 \u6708 22 \u65e5\u7f8e\u56fd\u4e1c\u90e8\u65f6\u95f4\u4e0b\u5348 5 \u70b9\u4e4b\u524d\u9001\u8fbe\u7814\u7a76\u6240\uff0c\u65b9\u53ef\u4e88\u4ee5\u8003\u8651<\/strong>\u3002\u6240\u6709\u8bc4\u8bba\u90fd\u5c06\u53d1\u5e03\u5230\u7f51\u7ad9\u4e0a\uff0c\u7533\u8bf7\u4eba\u5c06\u6709\u673a\u4f1a\u4f5c\u51fa\u56de\u5e94\u3002\u4efb\u4f55\u56de\u5e94\u4e5f\u5c06\u53d1\u5e03\u3002<\/p>\n<p>\u9879\u76ee\u63cf\u8ff0\u548c\u5b8c\u6574\u7533\u8bf7\u53ef\u4ee5\u5728\u8fd9\u91cc\u627e\u5230 <a href=\"https:\/\/lowimpacthydro.org\/zh_cn\/lihi-certificate-39-fifteen-mile-falls-project-vermont-and-new-hampshire\/\">\u8fd9\u91cc<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>January 21, 2022: The Low Impact Hydropower Institute (LIHI) has received a complete recertification application from Great River Hydro for the Fifteen Mile Falls Project located<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-4996","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/zh_cn\/wp-json\/wp\/v2\/posts\/4996","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/zh_cn\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/zh_cn\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh_cn\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh_cn\/wp-json\/wp\/v2\/comments?post=4996"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/zh_cn\/wp-json\/wp\/v2\/posts\/4996\/revisions"}],"predecessor-version":[{"id":4997,"href":"https:\/\/lowimpacthydro.org\/zh_cn\/wp-json\/wp\/v2\/posts\/4996\/revisions\/4997"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh_cn\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/zh_cn\/wp-json\/wp\/v2\/media?parent=4996"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh_cn\/wp-json\/wp\/v2\/categories?post=4996"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh_cn\/wp-json\/wp\/v2\/tags?post=4996"}],"curies":[{"name":"\u53ef\u6e7f\u6027\u7c89\u5242","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}