{"id":4960,"date":"2021-12-31T15:42:06","date_gmt":"2021-12-31T20:42:06","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=4960"},"modified":"2022-01-05T12:41:37","modified_gmt":"2022-01-05T17:41:37","slug":"final-decision-certification-of-the-arrowrock-project-lihi-81","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/zh\/final-decision-certification-of-the-arrowrock-project-lihi-81\/","title":{"rendered":"\u6700\u5f8c\u6c7a\u5b9a \u2013 Arrowrock \u5c08\u6848\u8a8d\u8b49\uff0cLIHI #81"},"content":{"rendered":"<p><strong>2022 \u5e74 1 \u6708 5 \u65e5\uff1a<\/strong> \u4f4e\u5f71\u97ff\u6c34\u529b\u767c\u96fb\u7814\u7a76\u6240\u5df2\u5c31\u4f4d\u65bc\u611b\u9054\u8377\u5dde\u535a\u4f0a\u897f\u6cb3\u4e0a\u5148\u524d\u5df2\u7372\u5f97\u8a8d\u8b49\u7684 Arrowrock \u8a08\u756b\u7684\u8a8d\u8b49\u505a\u51fa\u4e86\u6700\u7d42\u6c7a\u5b9a\u3002  30 \u5929\u7684\u4e0a\u8a34\u671f\u9650\u65bc 2021 \u5e74 12 \u6708 31 \u65e5\u95dc\u9589\uff0c\u5c1a\u672a\u6709\u4eba\u63d0\u51fa\u4e0a\u8a34\u3002  \u56e0\u6b64\uff0c\u91cd\u65b0\u8a8d\u8b49\u8a72\u5c08\u6848\u7684\u6c7a\u5b9a\u73fe\u5df2\u6700\u7d42\u6c7a\u5b9a\u3002  \u65b0\u4efb\u671f\u70ba2021\u5e749\u670820\u65e5\u81f32031\u5e749\u670819\u65e5\u3002<\/p>","protected":false},"excerpt":{"rendered":"<p>January 5, 2022: The Low Impact Hydropower Institute has issued a final decision on the certification of the previously certified Arrowrock Project located on the Boise<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[23,19],"tags":[],"class_list":["post-4960","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-certified-facilities","category-news"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/posts\/4960","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/comments?post=4960"}],"version-history":[{"count":2,"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/posts\/4960\/revisions"}],"predecessor-version":[{"id":4972,"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/posts\/4960\/revisions\/4972"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/media?parent=4960"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/categories?post=4960"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/tags?post=4960"}],"curies":[{"name":"\u53ef\u6fd5\u6027\u7c89\u5291","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}