{"id":10486,"date":"2026-04-13T11:04:48","date_gmt":"2026-04-13T15:04:48","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?page_id=10486"},"modified":"2026-10-06T12:26:56","modified_gmt":"2026-10-06T16:26:56","slug":"taftsville-project-vermont","status":"publish","type":"page","link":"https:\/\/lowimpacthydro.org\/zh\/taftsville-project-vermont\/","title":{"rendered":"Pending Application &#8211; Taftsville Project, Vermont"},"content":{"rendered":"<table class=\"alignright\" style=\"width: 351px; border: 2px; cellspacing: 2px; cellpadding: 2px; margin-left: 50px;\">\n<tbody>\n<tr>\n<td style=\"border-style: solid;\" width=\"162\"><strong>\u9805\u76ee\u540d\u7a31<\/strong><\/td>\n<td style=\"border-style: solid;\" width=\"180\">\u5854\u592b\u8328\u7dad\u723e<\/td>\n<\/tr>\n<tr>\n<td style=\"border-style: solid;\"><strong>\u7406\u6d77\u8b49\u66f8\u7de8\u865f<br \/>\n<\/strong><\/td>\n<td style=\"border-style: solid;\">\u7121<\/td>\n<\/tr>\n<tr>\n<td style=\"border-style: solid;\"><strong>LIHI \u8b49\u66f8\u671f\u9650<br \/>\n<\/strong><\/td>\n<td style=\"border-style: solid;\">\u7121<\/td>\n<\/tr>\n<tr>\n<td style=\"border-style: solid;\" width=\"162\"><strong>\u64c1\u6709\u8005<\/strong><\/td>\n<td style=\"border-style: solid;\" width=\"180\">\u7da0\u5c71\u96fb\u529b<\/td>\n<\/tr>\n<tr>\n<td style=\"border-style: solid;\" width=\"162\"><strong>\u72c0\u614b<\/strong><\/td>\n<td style=\"border-style: solid;\" width=\"180\">\u4f5b\u8499\u7279<\/td>\n<\/tr>\n<tr>\n<td style=\"border-style: solid;\" width=\"162\"><strong>\u5730\u9ede<\/strong><\/td>\n<td style=\"border-style: solid;\" width=\"180\">River Mile 11.3 on the Ottauquechee River<\/td>\n<\/tr>\n<tr>\n<td style=\"border-style: solid;\" width=\"162\"><strong>\u88dd\u7f6e\u5bb9\u91cf<\/strong><\/td>\n<td style=\"border-style: solid;\" width=\"180\">0.5 MW<\/td>\n<\/tr>\n<tr>\n<td style=\"border-style: solid;\" width=\"162\"><strong>\u5e73\u5747\u5e74\u767c\u96fb\u91cf<\/strong><\/td>\n<td style=\"border-style: solid;\" width=\"180\">1,038 MWh<\/td>\n<\/tr>\n<tr>\n<td style=\"border-style: solid;\" width=\"162\"><strong>\u8a2d\u65bd\u985e\u578b<\/strong><\/td>\n<td style=\"border-style: solid;\" width=\"180\"><span class='tooltipsall tooltip_post_id_5643 classtoolTips52'>\u5f91\u6d41<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"border-style: solid;\" width=\"162\"><strong><span class='tooltipsall tooltip_post_id_5565 classtoolTips152'>\u806f\u90a6\u80fd\u6e90\u76e3\u7ba1\u59d4\u54e1\u6703<\/span> \u4e0d\u3002<\/strong><\/td>\n<td style=\"border-style: solid;\" width=\"180\">P-2490 license issued in 1994, awaiting new license<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The Taftsville project is a 0.5-megawatt (MW) Taftsville Project located on the Ottauquechee River in the Hamlet of Taftsville, town of Woodstock, in Windsor County, Vermont. The Ottauquechee River has a mainstem length of 38 miles and drains an area of 223 square miles. From Killington Peak the river drops almost 3900 feet in elevation down to the Connecticut River in Hartland. There are no upstream dams on the river but there are several downstream dams including <a href=\"https:\/\/lowimpacthydro.org\/zh\/lihi-certificate-122-downers-mills-project-vermont\/\">Downer&#8217;s Mill (LIHI #122)<\/a> and the North Hartland USACE flood control <span class='tooltipsall tooltip_post_id_5545 classtoolTips158'>\u58e9<\/span>.<\/p>\n<p>The project consists of a 220-foot-long, 16-foot-high concrete <span class='tooltipsall tooltip_post_id_5580 classtoolTips81'>\u91cd\u529b\u58e9<\/span> which was originally constructed in 1794 and rebuilt for hydropower in 1909. The dam has a 194-foot-long <span class='tooltipsall tooltip_post_id_5651 classtoolTips116'>\u6ea2\u6d2a\u9053<\/span> section that has a crest elevation of 637.12 feet <span class='tooltipsall tooltip_post_id_5605 classtoolTips2'>\u570b\u5bb6\u5927\u5730\u5782\u76f4\u57fa\u6e96<\/span> 1929 \u5e74\uff08<span class='tooltipsall tooltip_post_id_5608 classtoolTips155'>\u80c3\u8178\u75be\u75c5<\/span> 29) and is topped with 18-inch-high wooden <span class='tooltipsall tooltip_post_id_5569 classtoolTips79'>\u9583\u5149\u677f<\/span>. The dam creates a 0.9-mile-long impoundment with a surface area of approximately 20.5 acres at the normal water surface elevation of 638.6 feet NGVD 29. The dam also creates a bypassed reach approximately 290 feet long. An integral intake structure contains a motorized headgate faced with a 15-foot-long by 13-foot-deep trashrack system with 3-inch clear bar spacing. A concrete <span class='tooltipsall tooltip_post_id_5619 classtoolTips124'>\u58d3\u529b\u6c34\u7ba1<\/span>, 11 feet high, 6 feet 8 inches wide, and 36 feet long conveys water from the dam to the <span class='tooltipsall tooltip_post_id_5624 classtoolTips102'>\u767c\u96fb\u7ad9<\/span> which is contains the single 0.5-MW vertical Kaplan turbine.\u00a0 Two <span class='tooltipsall tooltip_post_id_5656 classtoolTips92'>\u8b8a\u96fb\u7ad9<\/span> are located within the Project boundary as well as three approximately 75-foot-long, 46-kilovolt (kV) transmission lines, and (8) appurtenant equipment and facilities.<\/p>\n<p>\u8a72\u9805\u76ee\u904b\u71df\u65bc <span class='tooltipsall tooltip_post_id_5643 classtoolTips52'>\u5f91\u6d41<\/span> mode with stable impoundment level and when refilling the impoundment, 90 percent of inflow is passed while the remaining 10 percent is used to refill the impoundment. A year-round minimum flow of 45 cfs is provided uniformly over the dam crest to enhance aesthetics and support aquatic habitat, based on instream flow studies conducted for FERC relicensing.<\/p>\n<p>The Ottauquechee River in the Project area is classified as Class B(2) cold water fish habitat, managed to support the designated uses of aquatic biota, wildlife, and aquatic habitat; aesthetics; public water supply; irrigation of crops and other agricultural uses; swimming and other primary contact recreation; and boating, fishing, and other recreational uses. Water quality studies indicated that the project is not the cause of impairments from phosphorus and e coli in the impoundment. Additional water sampling will be conducted after the new FERC license is issued to confirm the that project does not adversely affect water quality.<\/p>\n<p>There are no migratory fish species in the project area due to downstream barriers on the Ottauquechee River and the mainstem Connecticut River. While the dam was built in the late 1700&#8217;s, the Turner Falls <span class='tooltipsall tooltip_post_id_5545 classtoolTips158'>\u58e9<\/span> downstream on the Connecticut River in Massachusetts was also built at that time, resulting in a major barrier to passage up into the Connecticut River watershed. Resident fish species include both cold water and warm water species. While some turbine <span class='tooltipsall tooltip_post_id_5558 classtoolTips77'>\u593e\u5e36<\/span> could occur for juvenile resident species the effect is expected to be minimal, and the bypass reach minimum flow provides a safe route of passage for downstream migrating fish.<\/p>\n<p>The project boundary encompasses 20.76 acres with 19.21 of those acres being the impoundment. Lands around the project consist of forest, agriculture and the minimally developed hamlet of Taftsville. There are no lands of ecological significance and run-of-river operations help to keep shorelines stable.<\/p>\n<p>Threatened or endangered species that may be present include northern-long eared bat, eastern pearlshell mussel (state listed) downstream of the project, and obedient plant (aka false dragon-<span class='tooltipsall tooltip_post_id_5581 classtoolTips154'>\u982d<\/span>) which was observed at the project. Tree cutting is restricted between April 1 and October 31 to protect bat habitat, and routine vegetation management within the small project footprint is unlikely to adversely affect plant or other species.<\/p>\n<p>The Taftsville dam, powerhouse, and substations are documented in a <span class='tooltipsall tooltip_post_id_5606 classtoolTips1'>\u570b\u5bb6\u6b77\u53f2\u907a\u8de1\u540d\u9304<\/span> registration form as contributing structures to the Taftsville Historic District. No archaeological sites have been documented at the project although shoreline erosion monitoring and annual reporting occur, and consultation with the state historic preservation office is required if previously undiscovered cultural or historic resources are found.<\/p>\n<p>The project provides public access on both sides of the river, including a parking and picnic area, interpretive sign, viewing platform, and bank fishing area, and a canoe portage. Access is provided free of charge.<\/p>\n<hr \/>\n<h3>\u8a8d\u8b49\u6b77\u53f2<\/h3>\n<p><strong>October 7, 2026<\/strong> The Low Impact Hydropower Institute has received a complete application for Low Impact Certification of the Taftsville Hydroelectric Project. \u00a0LIHI is seeking public comment on this application.\u00a0 Specifically, we are interested in knowing whether you think the Project meets the LIHI Low Impact Certification Criteria.\u00a0 Please review the program and criteria in LIHI\u2019s <a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2025\/02\/2nd-Edition-Handbook-Rev.-2.06-clean-final.pdf\">\u624b\u518a\u4fee\u8a02\u7248 2.06<\/a> \u7136\u5f8c\u67e5\u770b\u4e0b\u9762\u8a72\u9805\u76ee\u7684\u7533\u8acb\u8cc7\u6599\u3002<\/p>\n<p>\u8207\u7279\u5b9a LIHI \u6a19\u6e96\uff08\u6d41\u91cf\u3001\u6c34\u8cea\u3001 <span class='tooltipsall tooltip_post_id_5566 classtoolTips59'>\u9b5a\u9053<\/span>\u7b49\u7b49\uff09\u5c07\u975e\u5e38\u6709\u5e6b\u52a9\uff0c\u4f46\u6240\u6709\u8a55\u8ad6\u90fd\u6703\u88ab\u8003\u616e\u3002\u610f\u898b\u53ef\u4ee5\u900f\u904e\u96fb\u5b50\u90f5\u4ef6\u63d0\u4ea4\u7d66\u7814\u7a76\u6240 <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> with \u201cTaftsville Project Comments\u201d in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 68 Harrison Ave Ste 605, PMB 113938 Boston, Massachusetts 02111-1929.\u00a0 <strong>Comments must be received on or before 5 pm Eastern time on December 6, 2026<\/strong>\u00a0\u4e88\u4ee5\u8003\u616e\u3002\u6240\u6709\u8a55\u8ad6\u90fd\u5c07\u767c\u4f48\u5230\u7db2\u7ad9\u4e0a\uff0c\u7533\u8acb\u4eba\u5c07\u6709\u6a5f\u6703\u56de\u61c9\u3002\u4efb\u4f55\u56de\u61c9\u4e5f\u5c07\u88ab\u767c\u5e03\u3002<\/p>\n<hr \/>\n<h3>\u8a8d\u8b49\u6587\u4ef6<\/h3>\n<h4>2026 \u5e74\u7533\u8acb<\/h4>\n<ul style=\"color: black;\">\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/10\/0012314_Taftsville-LIHI-Application_20260913.pdf\">Taftsville LIHI Application<\/a><\/li>\n<\/ul>\n<hr \/>\n<h3>\u95dc\u9375\u6587\u4ef6<\/h3>\n<ul style=\"color: black;\">\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/10\/20250820-3005_P-2490-031_Envionmental-Assessment-Taftsville.pdf\">2025 FERC Environmental Assessment<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/10\/20250728-5077_WQC-Taftsville.pdf\">2025 Water Quality Certification<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/10\/19940923-0318_License-Order-Taftsville.pdf\">1994\u5e74\u806f\u90a6\u80fd\u6e90\u7ba1\u7406\u59d4\u54e1\u6703\u8a31\u53ef\u8b49<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Project Name Taftsville LIHI Certificate No. n\/a LIHI Certificate Term n\/a Owner Green Mountain Power State Vermont Location River Mile 11.3 on the Ottauquechee River Installed<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":-1,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"class_list":["post-10486","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/pages\/10486","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/comments?post=10486"}],"version-history":[{"count":12,"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/pages\/10486\/revisions"}],"predecessor-version":[{"id":10892,"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/pages\/10486\/revisions\/10892"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/zh\/wp-json\/wp\/v2\/media?parent=10486"}],"curies":[{"name":"\u53ef\u6fd5\u6027\u7c89\u5291","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}