{"id":9758,"date":"2025-07-01T11:34:41","date_gmt":"2025-07-01T15:34:41","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=9758"},"modified":"2025-07-01T11:40:37","modified_gmt":"2025-07-01T15:40:37","slug":"preliminary-decision-certification-of-the-skelton-project-pending-lihi-203-me","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/preliminary-decision-certification-of-the-skelton-project-pending-lihi-203-me\/","title":{"rendered":"D\u00e9cision pr\u00e9liminaire \u2013 Certification du projet Skelton, en attente LIHI #203, ME"},"content":{"rendered":"<p><strong>1er juillet 2025 :<\/strong> Le Low Impact Hydropower Institute (LIHI) a approuv\u00e9 de mani\u00e8re pr\u00e9liminaire la certification \u00e0 faible impact pour le projet hydro\u00e9lectrique de Skelton, <span class='tooltipsall tooltip_post_id_5565 classtoolTips152'>F\u00e9d\u00e9ration internationale de radio-t\u00e9l\u00e9vision (FERC)<\/span># P-2527 (en attente de LIHI #203). Le projet est situ\u00e9 sur la rivi\u00e8re Saco, dans le Maine. La demande compl\u00e8te et le rapport d&#039;\u00e9valuation sont disponibles.<a href=\"https:\/\/lowimpacthydro.org\/fr\/skelton-project\/\"><strong> ICI<\/strong><\/a>.<\/p>\n<p>Cette d\u00e9cision est pr\u00e9liminaire, dans l&#039;attente d&#039;un d\u00e9lai d&#039;appel de 30 jours. Seuls les candidats ayant comment\u00e9 les demandes initiales pendant ce d\u00e9lai de 60 jours sont autoris\u00e9s \u00e0 d\u00e9poser un recours. Ce recours doit inclure une explication expliquant en quoi les projets ne r\u00e9pondent pas aux crit\u00e8res du LIHI. Les demandes de recours peuvent \u00eatre soumises par courriel \u00e0 l&#039;adresse suivante\u00a0: <a href=\"mailto:comments@lowimpacthydro.org\">mailto:comments@lowimpacthydro.org<\/a> avec \u00ab\u00a0Projet Skelton\u00a0\u00bb dans l&#039;objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 68 Harrison Ave, Ste 605, PMB 113938, Boston, Massachusetts 02111-1929. Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. Les demandes doivent \u00eatre re\u00e7ues avant 17\u00a0h (heure de l&#039;Est) le 31\u00a0juillet\u00a02025. En l&#039;absence de demande d&#039;appel, la p\u00e9riode de certification s&#039;\u00e9tendra du 5\u00a0mars\u00a02025 au 4\u00a0mars\u00a02035.<\/p>","protected":false},"excerpt":{"rendered":"<p>July 1, 2025: The Low Impact Hydropower Institute (LIHI) has preliminarily approved Low Impact Certification for the Skelton Hydroelectric Project, FERC# P-2527 (pending LIHI #203). The<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":-1,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-9758","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/9758","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=9758"}],"version-history":[{"count":2,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/9758\/revisions"}],"predecessor-version":[{"id":9760,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/9758\/revisions\/9760"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=9758"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=9758"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=9758"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}