{"id":9370,"date":"2025-02-12T09:31:33","date_gmt":"2025-02-12T14:31:33","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=9370"},"modified":"2025-02-12T09:31:33","modified_gmt":"2025-02-12T14:31:33","slug":"mid-term-review-tallassee-shoals-project-lihi-12-ga","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/mid-term-review-tallassee-shoals-project-lihi-12-ga\/","title":{"rendered":"Bilan \u00e0 mi-parcours \u2013 Projet Tallassee Shoals, LIHI #12, GA"},"content":{"rendered":"<p><strong>12 f\u00e9vrier 2025 :<\/strong> Le projet Tallassee Shoals, LIHI #12, a re\u00e7u un nouveau <span class='tooltipsall tooltip_post_id_5565 classtoolTips152'>F\u00e9d\u00e9ration internationale de radio-t\u00e9l\u00e9vision (FERC)<\/span> Licence le 20 novembre 2024. Conform\u00e9ment \u00e0 la section 5.3.4 de la 2e \u00e9dition du manuel LIHI, la d\u00e9livrance d&#039;une nouvelle licence constitue un \u00ab changement important \u00bb et d\u00e9clenche un examen de certification LIHI \u00e0 mi-parcours. Une nouvelle dur\u00e9e de certificat peut \u00eatre accord\u00e9e si le projet continue de satisfaire aux crit\u00e8res LIHI m\u00eame si la dur\u00e9e actuelle n&#039;a pas encore expir\u00e9.<\/p>\n<p>LIHI sollicite des commentaires sur cette demande qui se trouve <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-12-tallassee-shoals-project-georgia\/\">ICI<\/a>. Commentaires directement li\u00e9s \u00e0 des crit\u00e8res LIHI sp\u00e9cifiques (d\u00e9bits, qualit\u00e9 de l&#039;eau, <span class='tooltipsall tooltip_post_id_5566 classtoolTips59'>passage des poissons<\/span>, etc.) seront tr\u00e8s utiles, mais tous les commentaires seront pris en compte. Les commentaires peuvent \u00eatre envoy\u00e9s au LIHI par courrier \u00e9lectronique \u00e0 l&#039;adresse <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u00ab Tallassee Shoals Project Comments \u00bb dans la ligne d&#039;objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 68 Harrison Ave. Ste 605, PMB 113938, Boston MA 02111-1929. <strong>Les commentaires doivent \u00eatre re\u00e7us avant 17 heures, heure de l\u2019Est, le 13 avril 2025 pour \u00eatre pris en compte. <\/strong>Tous les commentaires seront publi\u00e9s sur le site Web et le candidat aura la possibilit\u00e9 d&#039;y r\u00e9pondre. Toute r\u00e9ponse sera \u00e9galement publi\u00e9e.<\/p>","protected":false},"excerpt":{"rendered":"<p>February 12, 2025: The Tallassee Shoals Project, LIHI #12 was issued a new FERC license on November 20, 2024. In accordance with Section 5.3.4 of the<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-9370","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/9370","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=9370"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/9370\/revisions"}],"predecessor-version":[{"id":9371,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/9370\/revisions\/9371"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=9370"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=9370"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=9370"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}