{"id":8443,"date":"2023-11-28T12:00:31","date_gmt":"2023-11-28T17:00:31","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=8443"},"modified":"2023-11-28T12:00:31","modified_gmt":"2023-11-28T17:00:31","slug":"preliminary-decisions-recertification-of-the-red-bridge-putts-bridge-indian-orchard-and-dwight-projects-ma","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/preliminary-decisions-recertification-of-the-red-bridge-putts-bridge-indian-orchard-and-dwight-projects-ma\/","title":{"rendered":"D\u00e9cisions pr\u00e9liminaires \u2013 Recertification des projets Red Bridge, Putts Bridge, Indian Orchard et Dwight, MA"},"content":{"rendered":"<p><strong>28 novembre 2023 :<\/strong> Le Low Impact Hydropower Institute a approuv\u00e9 de mani\u00e8re pr\u00e9liminaire la recertification \u00e0 faible impact pour les projets hydro\u00e9lectriques Red Bridge, Putts Bridge, Indian Orchard et Dwight situ\u00e9s sur la rivi\u00e8re Chicopee dans le Massachusetts. Cette d\u00e9cision est pr\u00e9liminaire en attendant la p\u00e9riode d&#039;appel de 30 jours. Seuls ceux qui ont comment\u00e9 la demande initiale pendant la p\u00e9riode de commentaires de 60 jours sont \u00e9ligibles pour d\u00e9poser un appel. Un tel appel doit inclure une explication sur la raison pour laquelle le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes d&#039;appel peuvent \u00eatre soumises par courrier \u00e9lectronique \u00e0 <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u00ab Chicopee River Projects \u00bb dans l\u2019objet du message, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 1167 Massachusetts Ave, Arlington, MA 02476. Toutes les demandes seront publi\u00e9es sur le site Web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre, et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 heures, heure de l\u2019Est, le 28 d\u00e9cembre 2023. <\/strong><\/p>\n<p><strong>\u00a0<\/strong>Le dossier complet et le rapport d&#039;\u00e9valuation sont disponibles sur les pages web ci-dessous. En l&#039;absence de recours, les conditions de certification seront les suivantes\u00a0:<\/p>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-96-red-bridge-hydroelectric-project-massachusetts\/\">Pont Rouge \u2013 LIHI #96<\/a> 27 mars 2023 \u2013 26 mars 2033<\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-102-putts-bridge-hydroelectric-project-massachusetts\/\">Pont Putts \u2013 LIHI #102<\/a> 20 d\u00e9cembre 2023 \u2013 19 d\u00e9cembre 2033<\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-112-indian-orchard-hydroelectric-project-massachusetts\/\">Verger indien \u2013 LIHI #112<\/a>\u00a0\u00a0 19 juillet 2023 \u2013 18 juillet 2033<\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-170-dwight-project-massachusetts\/\">Dwight \u2013 LIHI #170<\/a>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 3 avril 2023 \u2013 2 avril 2033<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>November 28, 2023: The Low Impact Hydropower Institute has preliminarily approved Low Impact recertification for the Red Bridge, Putts Bridge, Indian Orchard and Dwight Projects Hydroelectric<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-8443","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/8443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=8443"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/8443\/revisions"}],"predecessor-version":[{"id":8444,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/8443\/revisions\/8444"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=8443"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=8443"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=8443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}