{"id":7306,"date":"2023-05-04T12:47:19","date_gmt":"2023-05-04T16:47:19","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=7306"},"modified":"2023-05-04T12:47:19","modified_gmt":"2023-05-04T16:47:19","slug":"preliminary-decision-certification-of-the-hailesboro-no-3-no-4-and-no-6-projects-pending-197-198-199-ny","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/preliminary-decision-certification-of-the-hailesboro-no-3-no-4-and-no-6-projects-pending-197-198-199-ny\/","title":{"rendered":"D\u00e9cision pr\u00e9liminaire \u2013 Certification des projets Hailesboro n\u00b0 3, n\u00b0 4 et n\u00b0 6, en attente #197, 198, 199, NY"},"content":{"rendered":"<p><strong>4 mai 2023 :<\/strong> Le Low Impact Hydropower Institute a approuv\u00e9 de mani\u00e8re pr\u00e9liminaire la certification \u00e0 faible impact pour les projets hydro\u00e9lectriques Hailesboro n\u00b0 3, n\u00b0 4 et n\u00b0 6. Les projets sont situ\u00e9s sur la rivi\u00e8re Oswegatchie \u00e0 New York.<\/p>\n<p>Cette d\u00e9cision est pr\u00e9liminaire en attendant la p\u00e9riode d\u2019appel de 30 jours. Seuls ceux qui ont comment\u00e9 les demandes initiales pendant la p\u00e9riode de commentaires de 60 jours sont \u00e9ligibles pour d\u00e9poser un appel. Un tel appel doit inclure une explication sur la raison pour laquelle les projets ne r\u00e9pondent pas aux crit\u00e8res du LIHI. Les demandes d\u2019appel peuvent \u00eatre soumises par courrier \u00e9lectronique \u00e0 comments@lowimpacthydro.org avec \u00ab Hailesboro Projects \u00bb dans la ligne d\u2019objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 1167 Massachusetts Ave, Arlington, MA 02476. Toutes les demandes seront publi\u00e9es sur le site Web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 heures, heure de l\u2019Est, le 3 juin 2023. <\/strong><\/p>\n<p>La candidature compl\u00e8te et le rapport de l&#039;examinateur sont disponibles <a href=\"https:\/\/lowimpacthydro.org\/fr\/hailesboro-no-3-4-6-project\/\">ICI<\/a>.<\/p>\n<p>Si aucune demande d\u2019appel n\u2019est re\u00e7ue, les d\u00e9lais de certification seront du 3 f\u00e9vrier 2023 au 2 f\u00e9vrier 2033.<\/p>","protected":false},"excerpt":{"rendered":"<p>May 4, 2023: The Low Impact Hydropower Institute has preliminarily approved Low Impact Certification for the Hailesboro No. 3, No. 4 and No. 6 Hydroelectric Projects.<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-7306","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/7306","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=7306"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/7306\/revisions"}],"predecessor-version":[{"id":7307,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/7306\/revisions\/7307"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=7306"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=7306"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=7306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}