{"id":4569,"date":"2021-07-01T15:11:30","date_gmt":"2021-07-01T19:11:30","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=4569"},"modified":"2021-07-01T15:11:30","modified_gmt":"2021-07-01T19:11:30","slug":"preliminary-decision-certification-of-the-white-river-lock-and-dam-no-1-no-2-and-no-3-projects-pending-lihi-179-180-181","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/preliminary-decision-certification-of-the-white-river-lock-and-dam-no-1-no-2-and-no-3-projects-pending-lihi-179-180-181\/","title":{"rendered":"D\u00e9cision pr\u00e9liminaire \u2013 Certification des projets d&#039;\u00e9cluse et de barrage de White River n\u00b0 1, n\u00b0 2 et n\u00b0 3, en attente de LIHI #179, #180, #181"},"content":{"rendered":"<p><strong>1er juillet 2021 :<\/strong> Le Low Impact Hydropower Institute (LIHI) a approuv\u00e9 de mani\u00e8re pr\u00e9liminaire la certification \u00e0 faible impact (en attente de LIHI #179, #180, #181) pour l&#039;\u00e9cluse de White River et <span class='tooltipsall tooltip_post_id_5545 classtoolTips158'>Barrage<\/span> Projets hydro\u00e9lectriques n\u00b0 1, n\u00b0 2 et n\u00b0 3 situ\u00e9s sur la rivi\u00e8re White en Arkansas.<\/p>\n<p>Cette d\u00e9cision est pr\u00e9liminaire en attendant la p\u00e9riode d&#039;appel de 30 jours. Seuls ceux qui ont comment\u00e9 la demande initiale pendant la p\u00e9riode de commentaires de 60 jours sont \u00e9ligibles pour d\u00e9poser un appel. Un tel appel doit inclure une explication sur la raison pour laquelle le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes d&#039;appel peuvent \u00eatre soumises par courrier \u00e9lectronique \u00e0 <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u00ab\u00a0White River Project\u00a0\u00bb en objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 1167 Massachusetts Ave, Arlington, MA 02476. Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre, et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 h, heure de l&#039;Est, le 31 juillet 2021.<\/strong>.<\/p>\n<p>Le dossier complet et le rapport d&#039;\u00e9valuation sont disponibles <a href=\"https:\/\/lowimpacthydro.org\/fr\/white-river-project-arkansas\/\">ICI<\/a>Si aucune demande d\u2019appel n\u2019est re\u00e7ue, les conditions de certification pour chaque projet seront du 9 juin 2021 au 8 juin 2026, sauf prolongation conform\u00e9ment \u00e0 la condition 2 (voir la page Web du projet).<\/p>","protected":false},"excerpt":{"rendered":"<p>July 1, 2021: The Low Impact Hydropower Institute (LIHI) has preliminarily approved Low Impact Certification (pending LIHI #179, #180, #181) for the White River Lock and<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-4569","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4569","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=4569"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4569\/revisions"}],"predecessor-version":[{"id":4570,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4569\/revisions\/4570"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=4569"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=4569"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=4569"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}