{"id":4421,"date":"2021-05-18T12:52:05","date_gmt":"2021-05-18T16:52:05","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=4421"},"modified":"2021-07-06T09:00:14","modified_gmt":"2021-07-06T13:00:14","slug":"preliminary-decision-recertification-of-the-siphon-power-project-lihi-73-or","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/preliminary-decision-recertification-of-the-siphon-power-project-lihi-73-or\/","title":{"rendered":"D\u00e9cision pr\u00e9liminaire \u2013 Recertification du projet Siphon Power, LIHI #73, OR"},"content":{"rendered":"<p><strong>18 mai 2021 :<\/strong> Le Low Impact Hydropower Institute (LIHI) a approuv\u00e9 de mani\u00e8re pr\u00e9liminaire le <span class='tooltipsall tooltip_post_id_5648 classtoolTips135'>Siphon<\/span> Projet d&#039;\u00e9nergie pour une nouvelle p\u00e9riode de 5 ans de certification \u00e0 faible impact.<\/p>\n<p>Cette d\u00e9cision est pr\u00e9liminaire en attendant la p\u00e9riode d&#039;appel de 30 jours. Seuls ceux qui ont comment\u00e9 la demande initiale pendant la p\u00e9riode de commentaires de 60 jours sont \u00e9ligibles pour d\u00e9poser un appel. Un tel appel doit inclure une explication sur la raison pour laquelle le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes d&#039;appel peuvent \u00eatre soumises par courrier \u00e9lectronique \u00e0\u00a0<a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a>\u00a0avec \u00ab Siphon Power Project \u00bb dans l&#039;objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 1167 Massachusetts Ave, Office 407, Arlington, MA 02476.<\/p>\n<p>Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 d&#039;y r\u00e9pondre et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 h, heure de l&#039;Est, le 17 juin 2021.<\/strong>. La demande compl\u00e8te et le rapport de l&#039;examinateur sont disponibles <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-73-siphon-power-hydroelectric-project-oregon\/\">ICI<\/a>.<\/p>\n<p>Si aucune demande d\u2019appel n\u2019est re\u00e7ue et que la d\u00e9cision devient d\u00e9finitive, la p\u00e9riode de certification du projet sera du 28 octobre 2020 au 27 octobre 2025.<\/p>","protected":false},"excerpt":{"rendered":"<p>May 18, 2021: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Siphon Power Project for a new 5-year term of Low Impact Certification. This<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-4421","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4421","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=4421"}],"version-history":[{"count":3,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4421\/revisions"}],"predecessor-version":[{"id":4573,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4421\/revisions\/4573"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=4421"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=4421"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=4421"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}