{"id":4419,"date":"2021-05-18T10:56:49","date_gmt":"2021-05-18T14:56:49","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=4419"},"modified":"2021-05-18T10:56:49","modified_gmt":"2021-05-18T14:56:49","slug":"preliminary-decision-recertification-of-the-hunts-pond-project-lihi-125-ma","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/preliminary-decision-recertification-of-the-hunts-pond-project-lihi-125-ma\/","title":{"rendered":"D\u00e9cision pr\u00e9liminaire \u2013 Recertification du projet Hunts Pond, LIHI #125, MA"},"content":{"rendered":"<p><strong>18 mai 2021 :<\/strong> Le Low Impact Hydropower Institute (LIHI) a approuv\u00e9 \u00e0 titre pr\u00e9liminaire le projet Hunts Pond (LIHI #125) pour une nouvelle certification \u00ab\u00a0faible impact\u00a0\u00bb d&#039;une dur\u00e9e de cinq ans. Cette certification est assortie d&#039;une condition\u00a0:<\/p>\n<ul>\n<li>Condition 1 : Au plus tard le 31 d\u00e9cembre 2021, le propri\u00e9taire de l&#039;installation doit d\u00e9montrer <span class='tooltipsall tooltip_post_id_5565 classtoolTips152'>F\u00e9d\u00e9ration internationale de radio-t\u00e9l\u00e9vision (FERC)<\/span>l&#039;approbation du plan de conformit\u00e9 du d\u00e9bit des cours d&#039;eau dat\u00e9 du 26\/01\/2016 et d\u00e9pos\u00e9 aupr\u00e8s de la FERC le 1er mai 2017 en soumettant \u00e0 LIHI soit une copie d&#039;une approbation FERC pr\u00e9existante comme demand\u00e9 dans la soumission du plan, soit une lettre \u00e0 la FERC demandant l&#039;approbation, et la d\u00e9livrance de l&#039;approbation de la FERC dans les 60 jours suivant sa r\u00e9ception de la FERC.<\/li>\n<\/ul>\n<p>Cette d\u00e9cision est pr\u00e9liminaire en attendant la p\u00e9riode d&#039;appel de 30 jours. Seuls ceux qui ont comment\u00e9 la demande initiale pendant la p\u00e9riode de commentaires de 60 jours sont \u00e9ligibles pour d\u00e9poser un appel. Un tel appel doit inclure une explication sur la raison pour laquelle le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes d&#039;appel peuvent \u00eatre soumises par courrier \u00e9lectronique \u00e0\u00a0<a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a>\u00a0avec \u00ab Hunts Pond Project \u00bb dans l&#039;objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 1167 Massachusetts Ave, Office 407, Arlington, MA 02476.<\/p>\n<p>Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 d&#039;y r\u00e9pondre et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 h, heure de l&#039;Est, le 17 juin 2021.<\/strong>. La demande compl\u00e8te et le rapport de l&#039;examinateur sont disponibles <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-125-hunts-pond-dam-project-massachusetts\/\">ICI<\/a>.<\/p>\n<p>Si aucune demande d\u2019appel n\u2019est re\u00e7ue et que la d\u00e9cision devient d\u00e9finitive, la p\u00e9riode de certification du projet sera du 11 f\u00e9vrier 2021 au 10 f\u00e9vrier 2026.<\/p>","protected":false},"excerpt":{"rendered":"<p>May 18, 2021: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Hunts Pond Project (LIHI #125) for a new 5-year term of Low Impact<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-4419","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4419","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=4419"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4419\/revisions"}],"predecessor-version":[{"id":4420,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4419\/revisions\/4420"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=4419"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=4419"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=4419"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}