{"id":4025,"date":"2021-01-06T12:57:31","date_gmt":"2021-01-06T17:57:31","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=4025"},"modified":"2021-01-06T12:57:31","modified_gmt":"2021-01-06T17:57:31","slug":"preliminary-decision-recertification-of-the-west-branch-st-regis-project-lihi-27-ny","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/preliminary-decision-recertification-of-the-west-branch-st-regis-project-lihi-27-ny\/","title":{"rendered":"D\u00e9cision pr\u00e9liminaire \u2013 Recertification du projet West Branch St. Regis, LIHI #27, NY"},"content":{"rendered":"<p><strong>6 janvier 2021 :<\/strong> Le Low Impact Hydropower Institute (LIHI) a approuv\u00e9 \u00e0 titre pr\u00e9liminaire la recertification du projet West Branch St. Regis (LIHI #27) pour une nouvelle p\u00e9riode de cinq ans. Le projet est situ\u00e9 sur le bras ouest du fleuve St. Regis, dans l&#039;\u00c9tat de New York. La certification comprend la condition suivante\u00a0:<\/p>\n<p><strong>Condition 1 :<\/strong>\u00a0 Si des activit\u00e9s d&#039;entretien le long de Parishville <span class='tooltipsall tooltip_post_id_5624 classtoolTips102'>centrale<\/span> Si l&#039;emprise de la route et du pipeline est significativement modifi\u00e9e, comme l&#039;application massive d&#039;herbicides, l&#039;\u00e9largissement de la chauss\u00e9e ou le remblayage adjacent \u00e0 la chauss\u00e9e o\u00f9 la la\u00eeche de Fernald a \u00e9t\u00e9 observ\u00e9e, le propri\u00e9taire de l&#039;installation doit consulter le NYSDEC concernant les impacts potentiels sur l&#039;esp\u00e8ce. Le propri\u00e9taire doit rendre compte de ces activit\u00e9s dans les rapports annuels de conformit\u00e9 du LIHI, y compris les r\u00e9sultats de la consultation et la preuve de la mise en \u0153uvre des exigences impos\u00e9es par le NYSDEC pour prot\u00e9ger cette esp\u00e8ce si elle est pr\u00e9sente sur le site.<\/p>\n<p>Cette d\u00e9cision est pr\u00e9liminaire en attendant la p\u00e9riode d&#039;appel de 30 jours. Seuls ceux qui ont comment\u00e9 la demande initiale pendant la p\u00e9riode de commentaires de 60 jours sont \u00e9ligibles pour d\u00e9poser un appel. Un tel appel doit inclure une explication sur la raison pour laquelle le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes d&#039;appel peuvent \u00eatre soumises par courrier \u00e9lectronique \u00e0 <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org <\/a>avec \u00ab\u00a0Projet West Branch St. Regis\u00a0\u00bb en objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre, et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 h, heure de l\u2019Est, le 5 f\u00e9vrier 2021. <\/strong>La candidature compl\u00e8te et le rapport de l&#039;examinateur sont disponibles<a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-27-west-branch-st-regis-hydroelectric-project-new-york\/\"><strong> ICI.<\/strong><\/a><\/p>\n<p>Si aucune demande d\u2019appel n\u2019est re\u00e7ue et que la d\u00e9cision devient d\u00e9finitive, la p\u00e9riode de certification du projet sera du 14 septembre 2020 au 13 septembre 2025.<\/p>","protected":false},"excerpt":{"rendered":"<p>January 6, 2021: The Low Impact Hydropower Institute (LIHI) has preliminarily approved recertification of the West Branch St. Regis Project (LIHI #27) for a new 5-year<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-4025","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4025","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=4025"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4025\/revisions"}],"predecessor-version":[{"id":4026,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/4025\/revisions\/4026"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=4025"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=4025"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=4025"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}