{"id":2242,"date":"2020-03-17T20:46:00","date_gmt":"2020-03-18T00:46:00","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=2242"},"modified":"2020-09-17T12:28:44","modified_gmt":"2020-09-17T16:28:44","slug":"preliminary-decision-recertification-of-greggs-falls-lihi-120","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/preliminary-decision-recertification-of-greggs-falls-lihi-120\/","title":{"rendered":"D\u00e9cision pr\u00e9liminaire \u2013 Recertification de Gregg&#039;s Falls, LIHI #120"},"content":{"rendered":"<p><strong>Lexington MA (17 mars 2020) :&nbsp;<\/strong> Le 16 mars 2020, le Low Impact Hydropower Institute (LIHI) a approuv\u00e9 provisoirement le projet Gregg&#039;s Falls (LIHI #120) pour une nouvelle certification de faible impact d&#039;une dur\u00e9e de huit ans. La certification comprend la condition suivante\u00a0:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Condition 1 : <\/strong>Si le propri\u00e9taire de l&#039;installation re\u00e7oit une notification du FWS ou du NHFG pendant la dur\u00e9e de la certification LIHI indiquant qu&#039;un passage en amont ou en aval est requis, le propri\u00e9taire doit informer LIHI dans les 90 jours suivant la notification et fournir des mises \u00e0 jour sur l&#039;\u00e9tat de la consultation de l&#039;agence, toutes les \u00e9tudes men\u00e9es, les plans de conception et un calendrier de mise en \u0153uvre dans les soumissions annuelles de conformit\u00e9.<\/li><\/ul>\n\n\n\n<p>Cette d\u00e9cision est pr\u00e9liminaire en attendant la p\u00e9riode d&#039;appel de 30 jours. Seuls ceux qui ont comment\u00e9 la demande initiale pendant la p\u00e9riode de commentaires de 60 jours sont \u00e9ligibles pour d\u00e9poser un appel. Un tel appel doit inclure une explication sur la raison pour laquelle le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes d&#039;appel peuvent \u00eatre soumises par courrier \u00e9lectronique \u00e0 <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u00ab\u00a0Projet Gregg&#039;s Falls\u00a0\u00bb en objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre, et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 h, heure de l&#039;Est, le 16 avril 2020.<\/strong>. La demande compl\u00e8te et le rapport de l&#039;examinateur sont disponibles <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-120-gregg-falls-hydroelectric-project-new-hampshire\/\">ICI<\/a>.<\/p>\n\n\n\n<p>Si aucune demande d\u2019appel n\u2019est re\u00e7ue et que la d\u00e9cision devient d\u00e9finitive, la p\u00e9riode de certification du projet sera du 26 janvier 2020 au 25 janvier 2028.<\/p>","protected":false},"excerpt":{"rendered":"<p>Lexington MA (March 17, 2020):&nbsp; On March 16, 2020 the Low Impact Hydropower Institute (LIHI) preliminarily approved the Gregg&#8217;s Falls Project (LIHI #120) for a new<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":1,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-2242","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/2242","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=2242"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/2242\/revisions"}],"predecessor-version":[{"id":2243,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/2242\/revisions\/2243"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=2242"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=2242"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=2242"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}