{"id":10854,"date":"2026-09-14T12:00:41","date_gmt":"2026-09-14T16:00:41","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=10854"},"modified":"2026-09-14T12:00:41","modified_gmt":"2026-09-14T16:00:41","slug":"preliminary-decision-midterm-recertification-of-the-gorham-project-lihi-153-nh-2","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/preliminary-decision-midterm-recertification-of-the-gorham-project-lihi-153-nh-2\/","title":{"rendered":"D\u00e9cision pr\u00e9liminaire \u2013 Recertification \u00e0 mi-parcours du projet Gorham, LIHI #153, NH"},"content":{"rendered":"<p><strong>14 septembre 2026 :<\/strong> L\u2019Institut de l\u2019hydro\u00e9lectricit\u00e9 \u00e0 faible impact (LIHI) a approuv\u00e9 \u00e0 titre pr\u00e9liminaire le projet Rumford Falls (LIHI #38), situ\u00e9 sur la rivi\u00e8re Androscoggin dans le Maine, pour une nouvelle p\u00e9riode de certification \u00e0 faible impact de 10 ans, suite \u00e0 un examen de certification \u00e0 mi-parcours. Le rapport de l\u2019examinateur est disponible. <a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/09\/Rumford-Falls-Mid-Term-Review-Report_2026-08-24.pdf\"><strong>ICI<\/strong><\/a><strong>.<\/strong><\/p>\n<p>Cette d\u00e9cision est provisoire et soumise \u00e0 l&#039;expiration du d\u00e9lai d&#039;appel de 30 jours. Seules les personnes ayant formul\u00e9 des observations sur la demande de r\u00e9examen \u00e0 mi-parcours durant la p\u00e9riode de consultation publique de 60 jours sont admissibles \u00e0 interjeter appel. Cet appel doit expliquer en quoi le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes d&#039;appel peuvent \u00eatre soumises par courriel \u00e0\u00a0<a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> Veuillez indiquer \u201c\u00a0Projet Rumford Falls\u00a0\u201d dans l\u2019objet de votre courriel ou envoyer votre demande par courrier \u00e0 l\u2019adresse suivante\u00a0: Low Impact Hydropower Institute, 68 Harrison Ave., Suite 605, PMB 113938, Boston, MA 02111-1929. Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 h, heure de l&#039;Est, le 14 octobre 2026.<\/strong>.Si aucune demande d&#039;appel n&#039;est re\u00e7ue et que la d\u00e9cision devient d\u00e9finitive, la p\u00e9riode de certification du projet s&#039;\u00e9tendra du 29 mars 2026 au 28 mars 2036.<\/p>","protected":false},"excerpt":{"rendered":"<p>September 14, 2026: The Low Impact Hydropower Institute (LIHI) has preliminarily approved the Rumford Falls Project (LIHI #38) located on the Androscoggin River in Maine for<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":-1,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-10854","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10854","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=10854"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10854\/revisions"}],"predecessor-version":[{"id":10855,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10854\/revisions\/10855"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=10854"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=10854"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=10854"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}