{"id":10583,"date":"2026-05-27T09:22:52","date_gmt":"2026-05-27T13:22:52","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=10583"},"modified":"2026-05-27T09:22:52","modified_gmt":"2026-05-27T13:22:52","slug":"preliminary-decision-certification-of-the-chicopee-falls-project-pending-lihi-208-ma","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/preliminary-decision-certification-of-the-chicopee-falls-project-pending-lihi-208-ma\/","title":{"rendered":"D\u00e9cision pr\u00e9liminaire \u2013 Certification du projet Chicopee Falls, en attente de LIHI #208, MA"},"content":{"rendered":"<p><strong>May 27, 2026:<\/strong> The Low Impact Hydropower Institute (LIHI) has preliminarily approved Low Impact Certification for the Chicopee Falls Hydroelectric Project (pending LIHI #208) located on the Chicopee River in Massachusetts. The full application and reviewer\u2019s report are available <a href=\"https:\/\/lowimpacthydro.org\/fr\/chicopee-falls-project-massachusetts\/\">ICI<\/a>.<\/p>\n<p>Cette d\u00e9cision est pr\u00e9liminaire, dans l&#039;attente d&#039;un d\u00e9lai d&#039;appel de 30 jours. Seuls les candidats ayant comment\u00e9 les demandes initiales pendant ce d\u00e9lai de 60 jours sont autoris\u00e9s \u00e0 d\u00e9poser un recours. Ce recours doit inclure une explication expliquant en quoi le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes de recours peuvent \u00eatre soumises par courriel \u00e0 l&#039;adresse suivante\u00a0: <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> with \u201cChicopee Falls Project\u201d in the subject line, or by mail addressed to the Low Impact Hydropower Institute, 68 Harrison Ave Ste 605, PMB 113938 Boston, Massachusetts 02111-1929. All requests will be posted to the website. The applicant will have an opportunity to respond and any response will also be posted. <strong>Requests must be received by 5 pm Eastern time on June 26, \u00a02026.\u00a0<\/strong>If no appeal requests are received the certification term will be\u00a0February 12, 2026 through February 11, 2036.<\/p>","protected":false},"excerpt":{"rendered":"<p>May 27, 2026: The Low Impact Hydropower Institute (LIHI) has preliminarily approved Low Impact Certification for the Chicopee Falls Hydroelectric Project (pending LIHI #208) located on<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":-1,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-10583","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10583","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=10583"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10583\/revisions"}],"predecessor-version":[{"id":10584,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10583\/revisions\/10584"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=10583"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=10583"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=10583"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}