{"id":10328,"date":"2026-01-23T09:36:19","date_gmt":"2026-01-23T14:36:19","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=10328"},"modified":"2026-01-23T09:37:54","modified_gmt":"2026-01-23T14:37:54","slug":"tannery-island-and-carthage-mill-project-ny-complete-applications-received","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/tannery-island-and-carthage-mill-project-ny-complete-applications-received\/","title":{"rendered":"Projet Tannery Island et Carthage Mill, NY \u2013 Dossiers de candidature complets re\u00e7us"},"content":{"rendered":"<p><strong>23 janvier 2026<\/strong> L&#039;Institut de l&#039;hydro\u00e9lectricit\u00e9 \u00e0 faible impact (LIHI) a re\u00e7u des dossiers complets de demande de certification \u00e0 faible impact pour les projets hydro\u00e9lectriques de Tannery Island et de Carthage Mill, situ\u00e9s sur la rivi\u00e8re Black, dans l&#039;\u00c9tat de New York. Le LIHI sollicite l&#039;avis du public sur ces demandes. Plus pr\u00e9cis\u00e9ment, nous souhaitons savoir si, selon vous, ces projets r\u00e9pondent aux crit\u00e8res de certification \u00e0 faible impact du LIHI, tels que r\u00e9vis\u00e9s dans la 2e \u00e9dition du manuel en vigueur au moment du d\u00e9p\u00f4t de la demande. Veuillez consulter le programme et les crit\u00e8res dans le manuel du LIHI. <a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2025\/02\/2nd-Edition-Handbook-Rev.-2.06-clean-final.pdf\">Manuel R\u00e9vision 2.06<\/a> Ensuite, examinez les documents de candidature pour le projet Tannery Island. <a href=\"https:\/\/lowimpacthydro.org\/fr\/tannery-island-project-new-york\/\">ICI<\/a> et pour le moulin de Carthage <a href=\"https:\/\/lowimpacthydro.org\/fr\/carthage-mill-project-new-york\/\">ICI<\/a>.<\/p>\n<p>Commentaires directement li\u00e9s \u00e0 des crit\u00e8res sp\u00e9cifiques du LIHI (d\u00e9bits, qualit\u00e9 de l&#039;eau, <span class='tooltipsall tooltip_post_id_5566 classtoolTips59'>passage des poissons<\/span>, Les commentaires (par exemple, ceux concernant des sujets pr\u00e9cis) seront tr\u00e8s utiles, mais tous les commentaires seront pris en compte. Vous pouvez soumettre vos commentaires sur l&#039;un ou l&#039;autre des projets \u00e0 l&#039;Institut par courriel \u00e0 l&#039;adresse suivante\u00a0: <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u201c Commentaires sur le projet Tannery Island \u2013 Carthage Mill \u201d dans l\u2019objet, ou par courrier adress\u00e9 \u00e0 Low Impact Hydropower Institute, 68 Harrison Ave Ste 605, PMB 113938 Boston, Massachusetts 02111-1929.\u00a0 <strong>Les commentaires doivent \u00eatre re\u00e7us au plus tard \u00e0 17 h, heure de l&#039;Est, le 24 mars 2026.<\/strong> Les commentaires seront pris en compte. Ils seront publi\u00e9s sur le site web et le candidat aura la possibilit\u00e9 d&#039;y r\u00e9pondre. Les r\u00e9ponses seront \u00e9galement publi\u00e9es.<\/p>","protected":false},"excerpt":{"rendered":"<p>January 23, 2026 The Low Impact Hydropower Institute has received complete applications for Low Impact Certification of the Tannery Island and Carthage Mill Hydroelectric Projects located<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":-1,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-10328","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10328","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=10328"}],"version-history":[{"count":3,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10328\/revisions"}],"predecessor-version":[{"id":10331,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10328\/revisions\/10331"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=10328"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=10328"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=10328"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}