{"id":10217,"date":"2025-12-11T09:26:51","date_gmt":"2025-12-11T14:26:51","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=10217"},"modified":"2025-12-11T09:26:51","modified_gmt":"2025-12-11T14:26:51","slug":"preliminary-decision-certification-of-maan-dam-project-pending-lihi-207-i","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/fr\/preliminary-decision-certification-of-maan-dam-project-pending-lihi-207-i\/","title":{"rendered":"D\u00e9cision pr\u00e9liminaire\u00a0: Certification du projet de barrage de Ma&#039;an, en attente de la demande LIHI #207-I"},"content":{"rendered":"<p><strong>11 d\u00e9cembre 2025 :<\/strong> L&#039;Institut de l&#039;hydro\u00e9lectricit\u00e9 \u00e0 faible impact (LIHI) a approuv\u00e9 \u00e0 titre pr\u00e9liminaire la certification \u00e0 faible impact pour la centrale de Ma&#039;an. <span class='tooltipsall tooltip_post_id_5545 classtoolTips158'>Barrage<\/span> Projet hydro\u00e9lectrique (en attente de la subvention LIHI #207-I) situ\u00e9 sur la rivi\u00e8re Dajia \u00e0 Taichung. Cette d\u00e9cision est prise nonobstant les crit\u00e8res d&#039;admissibilit\u00e9 actuels du programme, qui excluent les installations situ\u00e9es hors des \u00c9tats-Unis, car il s&#039;agit d&#039;un projet pilote et non d&#039;un pr\u00e9c\u00e9dent pour l&#039;ensemble du programme LIHI. Nous tirerons les le\u00e7ons de cette exp\u00e9rience pour envisager des modifications de nos crit\u00e8res d&#039;admissibilit\u00e9, et toute modification sera soumise \u00e0 consultation publique.<\/p>\n<p>La demande compl\u00e8te et le rapport de l&#039;\u00e9valuateur sont disponibles. <a href=\"https:\/\/lowimpacthydro.org\/fr\/maan-daija-river\/\">ICI<\/a>.<\/p>\n<p>Cette d\u00e9cision est pr\u00e9liminaire en attendant la p\u00e9riode d&#039;appel de 30 jours. Seuls ceux qui ont comment\u00e9 la demande initiale pendant la p\u00e9riode de commentaires de 60 jours sont \u00e9ligibles pour d\u00e9poser un appel. Un tel appel doit inclure une explication sur la raison pour laquelle le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes d&#039;appel peuvent \u00eatre soumises par courrier \u00e9lectronique \u00e0 <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u201c Projet de barrage de Ma&#039;an \u201d dans l&#039;objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 68 Harrison Ave Ste 605, PMB 113938 Boston, Massachusetts 02111-1929.<\/p>\n<p>Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 d&#039;y r\u00e9pondre et toute r\u00e9ponse sera \u00e9galement publi\u00e9e.\u00a0<strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 h, heure de l&#039;Est des \u00c9tats-Unis, le 12 janvier 2026.\u00a0\u00a0<\/strong>Si aucune demande d&#039;appel n&#039;est re\u00e7ue, la p\u00e9riode de certification s&#039;\u00e9tendra du 18 avril 2025 au 17 avril 2038.<\/p>","protected":false},"excerpt":{"rendered":"<p>December 11, 2025: The Low Impact Hydropower Institute (LIHI) has preliminarily approved Low Impact Certification for the Ma&#8217;an Dam Hydroelectric Project, (pending LIHI #207-I) located on<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":-1,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-10217","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10217","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=10217"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10217\/revisions"}],"predecessor-version":[{"id":10218,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/posts\/10217\/revisions\/10218"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=10217"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/categories?post=10217"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/tags?post=10217"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}