{"id":3749,"date":"2020-11-25T10:40:20","date_gmt":"2020-11-25T15:40:20","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?page_id=3749"},"modified":"2026-10-14T10:49:40","modified_gmt":"2026-10-14T14:49:40","slug":"lihi-certificate-175-upper-gorham-hydroelectric-project-new-hampshire","status":"publish","type":"page","link":"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-175-upper-gorham-hydroelectric-project-new-hampshire\/","title":{"rendered":"Certificat LIHI #175 \u2013 Projet hydro\u00e9lectrique d&#039;Upper Gorham, New Hampshire"},"content":{"rendered":"<table class=\"alignright\" style=\"width: 351px; border: 2px; cellspacing: 2px; cellpadding: 2px; margin-left: 50px;\">\n<tbody>\n<tr>\n<td width=\"162\"><strong>Nom du projet<\/strong><\/td>\n<td width=\"165\">Haut-Gorham<\/td>\n<\/tr>\n<tr>\n<td width=\"162\"><strong>Num\u00e9ro de certificat LIHI<\/strong><\/td>\n<td width=\"165\">175<\/td>\n<\/tr>\n<tr>\n<td width=\"162\"><strong>Dur\u00e9e du certificat LIHI<\/strong><\/td>\n<td width=\"165\">31 ao\u00fbt 2026 \u2013 30 ao\u00fbt 2036<\/td>\n<\/tr>\n<tr>\n<td><strong>Propri\u00e9taire<\/strong><\/td>\n<td>Great Lakes Hydro America, LLC, une filiale de Brookfield Renewable Energy Group<\/td>\n<\/tr>\n<tr>\n<td><strong>\u00c9tat<\/strong><\/td>\n<td>New Hampshire<\/td>\n<\/tr>\n<tr>\n<td><strong>Emplacement<\/strong><\/td>\n<td>Rivi\u00e8re Mile 133,2 \u2013 Rivi\u00e8re Androscoggin<\/td>\n<\/tr>\n<tr>\n<td><strong>Capacit\u00e9 install\u00e9e<\/strong><\/td>\n<td>4,8 MW<\/td>\n<\/tr>\n<tr>\n<td><strong>G\u00e9n\u00e9ration annuelle moyenne<\/strong><\/td>\n<td>14 661 MWh<\/td>\n<\/tr>\n<tr>\n<td><strong>Type d&#039;\u00e9tablissement<\/strong><\/td>\n<td>Au fil de l&#039;eau<\/td>\n<\/tr>\n<tr>\n<td><strong><span class='tooltipsall tooltip_post_id_5565 classtoolTips152'>F\u00e9d\u00e9ration internationale de radio-t\u00e9l\u00e9vision (FERC)<\/span> Non.<\/strong><\/td>\n<td>\u00a0P-2311, issued in 2025, expires 08\/31\/2065<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Le projet Upper Gorham est situ\u00e9 sur la rivi\u00e8re Androscoggin, dans le comt\u00e9 de Coos, au nord du New Hampshire. La rivi\u00e8re Androscoggin traverse les \u00c9tats du New Hampshire et du Maine. Elle rejoint la rivi\u00e8re Kennebec \u00e0 Merrymeeting Bay, dans le Maine, avant de se jeter dans le golfe du Maine, puis dans l&#039;oc\u00e9an Atlantique. Le bassin versant de la rivi\u00e8re Androscoggin abrite 19 projets hydro\u00e9lectriques situ\u00e9s le long de ses 286 kilom\u00e8tres de long.<\/p>\n<p>Le projet est l&#039;un des nombreux projets hydro\u00e9lectriques dans un rayon de 11 miles de la rivi\u00e8re Androscoggin entre Berlin et Shelburne, dans le New Hampshire, y compris les projets en amont : <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-174-cross-power-hydroelectric-project-new-hamps\/\">Puissance crois\u00e9e (LIHI #174)<\/a>, <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-188-cascade-project-new-hampshire\/\">Cascade (LIHI #188)<\/a> et <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-173-sawmill-hydroelectric-project-new-hampshire\/\">Scierie (LIHI #173)<\/a>, et deux projets en aval : <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-153-gorham-hydroelectric-project-new-hampshire\/\">Gorham (LIHI #153)<\/a>, et <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-176-shelburne-hydroelectric-project-new-hampshire\/\">Shelburne (LIHI #176)<\/a>.<\/p>\n<p>Le projet comprend un <span class='tooltipsall tooltip_post_id_5545 classtoolTips158'>barrage<\/span> construit \u00e0 l&#039;origine en 1904, puissance <span class='tooltipsall tooltip_post_id_5537 classtoolTips143'>canal<\/span>, <span class='tooltipsall tooltip_post_id_5624 classtoolTips102'>centrale<\/span>, quatre turbines et des \u00e9quipements de transmission. Le barrage mesure 235 m\u00e8tres de long et atteint une hauteur maximale de 9,4 m\u00e8tres. Il comprend\u00a0:<\/p>\n<ul style=\"color: black;\">\n<li>Une digue en terre de 133 pieds de long avec un mur en b\u00e9ton.<\/li>\n<li>Un caisson en bois et en roche de 300 pieds de long sur 18 pieds de haut <span class='tooltipsall tooltip_post_id_5651 classtoolTips116'>d\u00e9versoir<\/span> section de 5 pieds de haut <span class='tooltipsall tooltip_post_id_5569 classtoolTips79'>tableaux d&#039;affichage<\/span>.<\/li>\n<li>Un canal \u00e9lectrique de 122 pieds de long <span class='tooltipsall tooltip_post_id_5581 classtoolTips154'>t\u00eate<\/span> section de porte, surmont\u00e9e d&#039;un corps de garde de 113 pieds de long sur 16 pieds de large, avec huit batardeaux fonctionnels et deux non fonctionnels <span class='tooltipsall tooltip_post_id_5578 classtoolTips153'>portes<\/span>, chacun d&#039;environ 7,5 pieds de large. Les poubelles ont un espacement libre de 3 1\/8 pouces.<\/li>\n<li>Une digue en terre de 220 pieds de long avec un mur en b\u00e9ton.<\/li>\n<\/ul>\n<p>Le canal \u00e9lectrique mesure 1\u00a0020 m\u00e8tres de long, 30 m\u00e8tres de large et 5,5 m\u00e8tres de profondeur. La centrale \u00e9lectrique en briques et en acier comprend quatre g\u00e9n\u00e9rateurs horizontaux et quatre turbines horizontales. <span class='tooltipsall tooltip_post_id_5576 classtoolTips39'>Turbines Francis<\/span> pour une capacit\u00e9 totale combin\u00e9e de 4,8 MW.<\/p>\n<p>Le projet fonctionne dans un quasi-<span class='tooltipsall tooltip_post_id_5643 classtoolTips52'>au fil de l&#039;eau<\/span> mode and impounds a 45-acre reservoir. The impoundment is allowed to fluctuate over a 6-inch range. The project provides a minimum flow of 400 cfs into the 1-mile-long bypass reach throughout trout spawning season (March 1 \u2013 June 15) to optimize trout habitat. The rest of the year a 200 cfs minimum flow is provided. This flow regime was developed in consultation with US Fish and Wildlife Service (USFWS) and the New Hampshire Department of Environmental Services (NHDES).<\/p>\n<p>Les eaux situ\u00e9es dans le p\u00e9rim\u00e8tre du projet sont class\u00e9es en classe B, adapt\u00e9es \u00e0 la p\u00eache, aux loisirs de contact primaire et \u00e0 l&#039;approvisionnement en eau apr\u00e8s traitement. Les eaux du projet sont class\u00e9es comme d\u00e9grad\u00e9es en raison des rejets ant\u00e9rieurs de plusieurs usines de papier. Compte tenu de l&#039;exploitation au fil de l&#039;eau, le projet est peu susceptible d&#039;avoir un impact n\u00e9gatif sur la qualit\u00e9 de l&#039;eau.<\/p>\n<p>La rivi\u00e8re Androscoggin n&#039;est pas accessible aux <span class='tooltipsall tooltip_post_id_5549 classtoolTips96'>diadrome<\/span> Les esp\u00e8ces de poissons pr\u00e9sentes dans la zone du projet sont accessibles gr\u00e2ce aux chutes naturelles en aval, notamment les chutes Lewiston et Rumford. L&#039;anguille d&#039;Am\u00e9rique est pr\u00e9sente dans le cours inf\u00e9rieur de la rivi\u00e8re Androscoggin, bien qu&#039;elle n&#039;ait jamais historiquement atteint les parties sup\u00e9rieures de la rivi\u00e8re. La zone du projet abrite un habitat pour la p\u00eache en eau froide. Le D\u00e9partement de la p\u00eache et de la faune du New Hampshire proc\u00e8de chaque ann\u00e9e \u00e0 des empoissonnements en truites mouchet\u00e9es, arc-en-ciel et brunes en amont des projets. Parmi les esp\u00e8ces r\u00e9sidentes de la rivi\u00e8re, on trouve le m\u00e9n\u00e9s \u00e0 longue queue, l&#039;achigan \u00e0 petite bouche, le meunier noir, le m\u00e9n\u00e9 \u00e0 long nez, le m\u00e9n\u00e9 commun, le m\u00e9n\u00e9 \u00e0 queue tachet\u00e9e et la perchaude. La migration vers l&#039;aval peut se faire par le biais du d\u00e9bit du d\u00e9versoir, des l\u00e2chers d&#039;eau \u00e0 faible niveau des vannes et du d\u00e9bit de la prise d&#039;eau \u00e0 travers les grilles de d\u00e9grillage. Le projet n&#039;entrave pas le bon d\u00e9roulement du cycle de vie des poissons r\u00e9sidents.<\/p>\n<p>The project lands are limited to the area occupied by project infrastructure. Lands surrounding the project include developed areas to the west along Route 16 in the Gorham Upper Village and an abandoned railroad to the east. The project is subject to the New Hampshire Shoreland Water Quality Protection Act which governs shoreland uses within a 250-foot buffer of the high-water mark. Further, the project\u2019s run-of-river operations provides protection of the shoreline areas.<\/p>\n<p>Threatened or endangered species potentially present in the project vicinity include the Northern long-eared bat, Canada lynx, and proposed for listing tri-colored bat and monarch butterfly. The state-listed peregrine falcon may also be present. The project avoids removing trees from April 15 through October 31, unless emergency tree removal for public safety is necessary.<\/p>\n<p>The project dam, gatehouse, powerhouse, and machinery are eligible for <span class='tooltipsall tooltip_post_id_5606 classtoolTips1'>Registre national des lieux historiques<\/span> (NRHP) listing.\u00a0 No Native American lands, known as traditional cultural properties, or NRHP-eligible tribal resources are present within the Project boundary. The project operates under a Programmatic Agreement (PA) in consultation with the State Historic Preservation Office. The PA and related Historic Properties Management Plan (HPMP) provides provisions detailing annual monitoring and reporting concerning repair and improvement activities conducted as well as any scheduled activities for the upcoming year.<\/p>\n<p>There are no project recreational facilities. Non-project recreational opportunities at the impoundment include hiking\/walking, picnicking, kayaking, fishing, scenic viewing, dog walking, and swimming. The bridge across the river leading to the powerhouse (crossing the bypassed reach) is part of the Mahoosuc Trail, maintained by the Appalachian Mountain Club, and joins the Appalachian Trail on the north side of the river. Those lands are owned by the project and the NH Department of Transportation. Public access is provided free of charge where safe access is available.<\/p>\n<hr \/>\n<h3>\u00c9tat de conformit\u00e9<\/h3>\n<p><strong>Le certificat comprend les conditions sp\u00e9cifiques \u00e0 l&#039;\u00e9tablissement suivantes :<\/strong><\/p>\n<p><strong>Condition 1<\/strong>Le propri\u00e9taire de l&#039;installation doit soumettre le plan final de suivi de la conformit\u00e9 op\u00e9rationnelle (OCMP) \u00e0 LIHI une fois celui-ci approuv\u00e9 par les organismes de gestion des ressources et la FERC. Lors de ses soumissions annuelles de conformit\u00e9 \u00e0 LIHI, le propri\u00e9taire de l&#039;installation doit fournir un r\u00e9sum\u00e9 de tous les \u00e9carts op\u00e9rationnels, planifi\u00e9s ou non, survenus au cours de l&#039;ann\u00e9e, ainsi que les preuves de consultation des organismes de gestion des ressources et les commentaires re\u00e7us.<\/p>\n<p><strong>Condition 2<\/strong>: The Facility Owner shall submit the final Historic Properties Management Plan (HPMP) to LIHI once it has been approved by the SHPO and FERC. In annual compliance submittals to LIHI, the Facility Owner shall report on any consultation that occurred during the year related to ground-disturbing or other activities subject to the HPMP.<\/p>\n<p><strong>\u00c9tat 3<\/strong>: The Facility Owner shall work with the NH Department of Transportation on improvements to the boat access area, and with the Trinity Assembly of God on picnic table replacement when replacement is needed. The Facility Owner shall report to LIHI on the status of the improvements in annual compliance submittals.<\/p>\n<p><strong>2026:<\/strong> Le rapport annuel pour le certificat actuel n\u2019est pas encore entr\u00e9 en vigueur.<\/p>\n<hr \/>\n<h3>Historique des certifications<\/h3>\n<p><strong>18 ao\u00fbt 2026 :<\/strong> The Low Impact Hydropower Institute has preliminarily approved Low Impact recertification for the Upper Gorham Hydroelectric Project. The mid-term review applications and reviewer report are available below. The certification includes three conditions included in the review report to ensure that FERC relicensing implementation measures are timely met.\u00a0The decision is preliminary pending the 30-day appeal window. Only those who commented on the initial application during the 60-day comment period are eligible to file an appeal. Such appeal needs to include an explanation as to how the Project does not meet the LIHI criteria. Appeal requests can be submitted by email to <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> Veuillez indiquer \u201c\u00a0Projet Upper Gorham\u00a0\u201d dans l\u2019objet de votre courriel ou envoyer votre demande par courrier \u00e0 l\u2019adresse suivante\u00a0: Low Impact Hydropower Institute, 68 Harrison Ave Ste 605, PMB 113938 Boston, Massachusetts 02111-1929. Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre, et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 h, heure de l&#039;Est, le 17 septembre 2026. <\/strong>Si aucune demande d&#039;appel n&#039;est re\u00e7ue, la nouvelle p\u00e9riode de certification s&#039;\u00e9tendra du 31 ao\u00fbt 2026 au 30 ao\u00fbt 2036.<\/p>\n<p><strong>28 avril 2026 : <\/strong>L\u2019Institut de l\u2019hydro\u00e9lectricit\u00e9 \u00e0 faible impact (LIHI) a re\u00e7u un dossier de demande complet (voir ci-dessous) pour un examen \u00e0 mi-parcours du projet Upper Gorham. Ce projet fait partie des nombreux projets certifi\u00e9s LIHI situ\u00e9s sur le cours sup\u00e9rieur de la rivi\u00e8re Androscoggin, dans le New Hampshire, qui ont obtenu de nouvelles autorisations de la FERC en septembre 2025. Conform\u00e9ment \u00e0 la section 5.3.4 de la 2e \u00e9dition du Manuel LIHI, la d\u00e9livrance d\u2019une nouvelle autorisation constitue un \u201c\u00a0changement important\u00a0\u201d et d\u00e9clenche un examen \u00e0 mi-parcours de la certification LIHI.\u00a0<strong>\u00a0<\/strong>LIHI sollicite l&#039;avis du public sur cette demande. Plus pr\u00e9cis\u00e9ment, nous souhaitons savoir si vous estimez que le projet continue de satisfaire aux crit\u00e8res de certification \u00e0 faible impact de LIHI, tels que r\u00e9vis\u00e9s dans la 2e \u00e9dition du manuel. Les commentaires directement li\u00e9s \u00e0 des crit\u00e8res sp\u00e9cifiques de LIHI (d\u00e9bits, qualit\u00e9 de l&#039;eau, etc.) sont les bienvenus., <span class='tooltipsall tooltip_post_id_5566 classtoolTips59'>passage des poissons<\/span>, etc.) seront tr\u00e8s utiles, mais tous les commentaires seront pris en compte. Les commentaires peuvent \u00eatre envoy\u00e9s au LIHI par courrier \u00e9lectronique \u00e0 l&#039;adresse\u00a0<a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u201c\u00a0Commentaires sur Upper Gorham\u00a0\u201d dans l\u2019objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 68 Harrison Ave. Ste 605, PMB 113938, Boston MA 02111-1929.\u00a0<strong>Les commentaires doivent \u00eatre re\u00e7us avant 17 h, heure de l&#039;Est, le 27 juin 2026 pour \u00eatre pris en compte. <\/strong>Tous les commentaires seront publi\u00e9s sur le site web et les candidats auront la possibilit\u00e9 d&#039;y r\u00e9pondre. Toute r\u00e9ponse sera \u00e9galement publi\u00e9e.<\/p>\n<p><strong>1er janvier 2022 :<\/strong> La dur\u00e9e du certificat LIHI a \u00e9t\u00e9 prolong\u00e9e conform\u00e9ment \u00e0 la r\u00e9vision 2.05 du manuel de certification LIHI 2e \u00e9dition publi\u00e9 le 1er janvier 2022. Reportez-vous au tableau des \u00e9tablissements ci-dessus pour conna\u00eetre la nouvelle dur\u00e9e.<\/p>\n<p><strong>30 novembre 2020 :<\/strong> La d\u00e9cision de certification du projet Upper Gorham est devenue d\u00e9finitive apr\u00e8s la cl\u00f4ture de la p\u00e9riode d&#039;appel, le 27 novembre 2020, sans qu&#039;aucun appel n&#039;ait \u00e9t\u00e9 d\u00e9pos\u00e9. La p\u00e9riode de certification s&#039;\u00e9tend du 31 ao\u00fbt 2020 au 30 ao\u00fbt 2025.<\/p>\n<p><strong>27 octobre 2020 :<\/strong>Le Low Impact Hydropower Institute (LIHI) a approuv\u00e9 la certification \u00ab\u00a0faible impact\u00a0\u00bb pour les projets hydro\u00e9lectriques Sawmill, Cross Power, Upper Gorham et Shelburne, situ\u00e9s sur la rivi\u00e8re Androscoggin, dans le New Hampshire. Cette d\u00e9cision est provisoire et attend la fin du d\u00e9lai d&#039;appel de 30\u00a0jours. Seuls les intervenants ayant comment\u00e9 la demande initiale pendant ce d\u00e9lai de 60\u00a0jours sont autoris\u00e9s \u00e0 d\u00e9poser un recours. Ce recours doit inclure une explication expliquant en quoi le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes de recours pour un ou plusieurs de ces projets peuvent \u00eatre soumises par courriel \u00e0 l&#039;adresse suivante\u00a0: <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u00ab\u00a0Projets sur la rivi\u00e8re Androscoggin-NH\u00a0\u00bb en objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre, et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 heures, heure de l\u2019Est, le 27 novembre 2020. <\/strong>Le dossier de candidature complet et le rapport d&#039;\u00e9valuation sont disponibles ci-dessous. Si aucune demande d&#039;appel n&#039;est re\u00e7ue, la p\u00e9riode de certification pour chaque projet sera du 31 ao\u00fbt 2020 au 30 ao\u00fbt 2025.<\/p>\n<p><strong>13 ao\u00fbt 2020 :<\/strong> L\u2019Institut de l\u2019hydro\u00e9lectricit\u00e9 \u00e0 faible impact (LIHI) a re\u00e7u un dossier complet de demande de certification \u00e0 faible impact pour les projets hydro\u00e9lectriques de Sawmill, Cross Power, Upper Gorham et Shelburne, situ\u00e9s sur la rivi\u00e8re Androscoggin, dans le New Hampshire. Le LIHI sollicite l\u2019avis du public sur cette demande. Plus pr\u00e9cis\u00e9ment, nous souhaitons savoir si, selon vous, ces projets r\u00e9pondent aux crit\u00e8res de certification \u00e0 faible impact du LIHI, tels que r\u00e9vis\u00e9s dans la 2e \u00e9dition du manuel. Le dossier de demande est disponible ci-dessous. Les commentaires portant directement sur des crit\u00e8res sp\u00e9cifiques du LIHI (d\u00e9bits, qualit\u00e9 de l\u2019eau, passage des poissons, etc.) seront particuli\u00e8rement utiles, mais tous les commentaires seront pris en compte. Vous pouvez soumettre vos commentaires \u00e0 l\u2019Institut par courriel \u00e0 l\u2019adresse suivante\u00a0: <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u00ab\u00a0Commentaires sur le projet Androscoggin River-NH\u00a0\u00bb en objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. Pour \u00eatre pris en compte, les commentaires doivent \u00eatre re\u00e7us au plus tard le 12 octobre 2020 \u00e0 17\u00a0h (heure de l&#039;Est). Tous les commentaires seront publi\u00e9s sur le site web et le demandeur aura la possibilit\u00e9 d&#039;y r\u00e9pondre. Toute r\u00e9ponse sera \u00e9galement publi\u00e9e.<\/p>\n<hr \/>\n<h3>Dossiers de certification<\/h3>\n<h4>Bilan de mi-mandat 2026<\/h4>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/10\/Mid-Term-Review-Upper-Gorham-Hydroelectric-Project-71226.pdf\">Rapport d&#039;\u00e9valuation \u00e0 mi-parcours d&#039;Upper Gorham<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20260203-Upper-Andro-LIHI-Mid-Term-Review-Application.pdf\">Demande de r\u00e9vision \u00e0 mi-parcours du cours sup\u00e9rieur de l&#039;Androscoggin<\/a><\/li>\n<\/ul>\n<h4>Certification 2020<\/h4>\n<ul style=\"color: black;\">\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/11\/Berlin-NH-Projects-Certification-Review-2020.pdf\">Examen de la certification des projets Berlin NH 2020<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/12\/20200831-Berlin-NH-Revised-LIHI-Application.pdf\">Demande de certification des projets NH de Berlin 2020<\/a><\/li>\n<\/ul>\n<hr \/>\n<h3>Documents cl\u00e9s<\/h3>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20250909-Upper-Gorham-FERC-license-and-WQC.pdf\">Licence FERC et certificat de qualit\u00e9 de l&#039;eau d&#039;Upper Gorham 2025<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20241007-Upper-Gorham-FEA-final.pdf\">\u00c9valuation environnementale FERC d&#039;Upper Gorham 2024<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/06\/20220801-5028_GLHA-Volume-II-FLA.pdf\">Demande de licence finale de Great Lake Hydro America pour 2022 - Annexe E<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Project Name Upper Gorham LIHI Certificate No. 175 LIHI Certificate Term August 31, 2026 &#8211; August 30, 2036 Owner Great Lakes Hydro America, LLC, a subsidiary<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":3,"featured_media":-1,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"class_list":["post-3749","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages\/3749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=3749"}],"version-history":[{"count":11,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages\/3749\/revisions"}],"predecessor-version":[{"id":10934,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages\/3749\/revisions\/10934"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=3749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}