{"id":3746,"date":"2020-11-25T09:45:59","date_gmt":"2020-11-25T14:45:59","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?page_id=3746"},"modified":"2026-10-14T10:49:21","modified_gmt":"2026-10-14T14:49:21","slug":"lihi-certificate-174-cross-power-hydroelectric-project-new-hampshire","status":"publish","type":"page","link":"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-174-cross-power-hydroelectric-project-new-hampshire\/","title":{"rendered":"Certificat LIHI #174 \u2013 Projet hydro\u00e9lectrique Cross Power, New Hampshire"},"content":{"rendered":"<table class=\"alignright\" style=\"width: 351px; border: 2px; cellspacing: 2px; cellpadding: 2px; margin-left: 50px;\">\n<tbody>\n<tr>\n<td width=\"162\"><strong>Nom du projet<\/strong><\/td>\n<td width=\"165\">Puissance crois\u00e9e<\/td>\n<\/tr>\n<tr>\n<td width=\"162\"><strong>Num\u00e9ro de certificat LIHI<\/strong><\/td>\n<td width=\"165\">174<\/td>\n<\/tr>\n<tr>\n<td width=\"162\"><strong>Dur\u00e9e du certificat LIHI<\/strong><\/td>\n<td width=\"165\">31 ao\u00fbt 2026 \u2013 30 ao\u00fbt 2036<\/td>\n<\/tr>\n<tr>\n<td><strong>Propri\u00e9taire<\/strong><\/td>\n<td>Great Lakes Hydro America, LLC, une filiale de Brookfield Renewable Energy Group<\/td>\n<\/tr>\n<tr>\n<td><strong>\u00c9tat<\/strong><\/td>\n<td>New Hampshire<\/td>\n<\/tr>\n<tr>\n<td><strong>Emplacement<\/strong><\/td>\n<td>Rivi\u00e8re Mile 136,9 \u2013 Rivi\u00e8re Androscoggin<\/td>\n<\/tr>\n<tr>\n<td><strong>Capacit\u00e9 install\u00e9e<\/strong><\/td>\n<td>3,445 MW<\/td>\n<\/tr>\n<tr>\n<td><strong>G\u00e9n\u00e9ration annuelle moyenne<\/strong><\/td>\n<td>12,674 MWh<\/td>\n<\/tr>\n<tr>\n<td><strong>Type d&#039;\u00e9tablissement<\/strong><\/td>\n<td>Au fil de l&#039;eau<\/td>\n<\/tr>\n<tr>\n<td><strong><span class='tooltipsall tooltip_post_id_5565 classtoolTips152'>F\u00e9d\u00e9ration internationale de radio-t\u00e9l\u00e9vision (FERC)<\/span> Non.<\/strong><\/td>\n<td>P-2326, issued in 2025, expires 08\/31\/2065<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Le projet Cross Power est situ\u00e9 sur la rivi\u00e8re Androscoggin, dans le comt\u00e9 de Coos, au nord du New Hampshire. La rivi\u00e8re Androscoggin traverse les \u00c9tats du New Hampshire et du Maine. Elle rejoint la rivi\u00e8re Kennebec \u00e0 Merrymeeting Bay, dans le Maine, avant de se jeter dans le golfe du Maine, puis dans l&#039;oc\u00e9an Atlantique. Le bassin versant de la rivi\u00e8re Androscoggin abrite 19 projets hydro\u00e9lectriques situ\u00e9s le long de ses 286 kilom\u00e8tres de long.<\/p>\n<p>Le projet est l&#039;un des nombreux projets hydro\u00e9lectriques dans un rayon de 11 miles de la rivi\u00e8re Androscoggin entre Berlin et Shelburne, dans le New Hampshire, y compris la partie en amont <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-173-sawmill-hydroelectric-project-new-hampshire\/\">Projet de scierie (LIHI #173)<\/a> et projets en aval : <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-188-cascade-project-new-hampshire\/\">Cascade (LIHI #188)<\/a>, <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-175-upper-gorham-hydroelectric-project-new-hampshire\/\">Upper Gorham (LIHI #175)<\/a>, <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-153-gorham-hydroelectric-project-new-hampshire\/\">Gorham (LIHI #153)<\/a>, et <a href=\"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-176-shelburne-hydroelectric-project-new-hampshire\/\">Shelburne (LIHI #176)<\/a>.<\/p>\n<p>La puissance de la croix <span class='tooltipsall tooltip_post_id_5545 classtoolTips158'>barrage<\/span> Construit initialement en 1903, il mesure 448 pieds de long et atteint une hauteur maximale de 20 pieds. Il se compose de\u00a0:<\/p>\n<ul style=\"color: black;\">\n<li>Sections en b\u00e9ton sans d\u00e9bordement, attenantes \u00e0 un affleurement de corniche. Une section comporte une ouverture pour poutrelle servant \u00e0 \u00e9vacuer les d\u00e9bris accumul\u00e9s. L&#039;autre section est situ\u00e9e de l&#039;affleurement jusqu&#039;\u00e0 la <span class='tooltipsall tooltip_post_id_5651 classtoolTips116'>d\u00e9versoir<\/span>.<\/li>\n<li>Une section de d\u00e9versoir de 276 pieds de long avec une hauteur de 42 pouces nouvellement con\u00e7ue <span class='tooltipsall tooltip_post_id_5569 classtoolTips79'>tableaux d&#039;affichage<\/span> install\u00e9 \u00e0 l&#039;automne 2020.<\/li>\n<li>Un corps de garde de 5,8 m\u00e8tres de large sur 38 m\u00e8tres de long, compos\u00e9 de cinq trav\u00e9es. Chaque trav\u00e9e contient des casiers \u00e0 d\u00e9chets de 6,6 m\u00e8tres de large sur 5,6 m\u00e8tres de haut, espac\u00e9s de 7,6 cm.<\/li>\n<li>Un mur de sout\u00e8nement en b\u00e9ton s&#039;\u00e9tendant de la gu\u00e9rite jusqu&#039;\u00e0 la berge de la rivi\u00e8re.<\/li>\n<\/ul>\n<p>Le <span class='tooltipsall tooltip_post_id_5624 classtoolTips102'>centrale<\/span> Elle est situ\u00e9e \u00e0 13,4 m\u00e8tres en aval du poste de vannes. La centrale hydro\u00e9lectrique est constitu\u00e9e d&#039;une sous-structure en b\u00e9ton et d&#039;une superstructure en briques, avec une extension c\u00f4t\u00e9 rive aval abritant cinq turbines \u00e0 h\u00e9lice horizontales d&#039;une puissance install\u00e9e totale de 3,445 MW.<\/p>\n<p>Le projet fonctionne en quasi-<span class='tooltipsall tooltip_post_id_5643 classtoolTips52'>au fil de l&#039;eau<\/span> Le mode de fonctionnement du barrage et la retenue d&#039;eau constituent un r\u00e9servoir de 22 acres. Le niveau de retenue peut fluctuer sur une plage de 6 pouces. La d\u00e9rivation \u00e9tant tr\u00e8s courte, la centrale est pratiquement int\u00e9gr\u00e9e au barrage. En raison du reflux des eaux provenant du projet Cascade en aval, aucun d\u00e9bit minimal n&#039;est sp\u00e9cifi\u00e9. Le r\u00e9gime d&#039;\u00e9coulement a \u00e9t\u00e9 \u00e9labor\u00e9 en consultation avec le Service am\u00e9ricain de la p\u00eache et de la faune sauvage (USFWS) et le D\u00e9partement des services environnementaux du New Hampshire.<\/p>\n<p>Les eaux situ\u00e9es dans le p\u00e9rim\u00e8tre du projet sont class\u00e9es classe B, adapt\u00e9es \u00e0 la p\u00eache, aux loisirs de contact primaire et \u00e0 l&#039;approvisionnement en eau apr\u00e8s traitement. Les eaux du projet sont class\u00e9es comme d\u00e9grad\u00e9es en raison des rejets ant\u00e9rieurs de plusieurs usines de papier. Compte tenu de l&#039;exploitation au fil de l&#039;eau, le projet est peu susceptible d&#039;avoir un impact n\u00e9gatif sur la qualit\u00e9 de l&#039;eau.<\/p>\n<p>La rivi\u00e8re Androscoggin n&#039;est pas accessible aux <span class='tooltipsall tooltip_post_id_5549 classtoolTips96'>diadrome<\/span> fish species in the project reach due to downstream natural falls \u2013 Lewiston and Rumford Falls. American eel are present in the lower reaches of the Androscoggin River though none have historically reached the upper sections of the river. The project area supports cold-water fishery habitat. New Hampshire Department of Fish and Game annually stocks brook, rainbow, and brown trout upstream of the project. Resident river species include fallfish, smallmouth bass, white sucker, longnose dace, common shiner, spottail shiner, and yellow perch. Downstream passage can occur by means of spillway flow, low-level gate releases, and power intake flow through the trashracks. The project does not impede the successful completion of resident fish life cycles.<\/p>\n<p>Les terres du projet se limitent \u00e0 la zone occup\u00e9e par les infrastructures. L&#039;exploitation au fil de l&#039;eau et la faible fluctuation des retenues d&#039;eau assurent la protection des zones riveraines.<\/p>\n<p>Threatened or endangered species potentially present in the project vicinity include the Northern long-eared bat, Canada lynx, the proposed for listing tri-colored bat and monarch butterfly. The project avoids removing trees from April 15 through October 31, unless emergency tree removal for public safety is necessary.<\/p>\n<p>The project&#8217;s dam, powerhouse, gatehouse, and gatehouse machinery are eligible for listing on the <span class='tooltipsall tooltip_post_id_5606 classtoolTips1'>Registre national des lieux historiques<\/span> (Site inscrit au Registre national des lieux historiques). Aucun territoire am\u00e9rindien, reconnu comme bien culturel traditionnel, ni aucune ressource tribale admissible au Registre national des lieux historiques ne se trouve \u00e0 l&#039;int\u00e9rieur du p\u00e9rim\u00e8tre du projet. Ce dernier est mis en \u0153uvre dans le cadre d&#039;une convention-cadre (CC) en consultation avec le Bureau de la pr\u00e9servation historique de l&#039;\u00c9tat. La CC et le plan de gestion des biens historiques (PGBH) associ\u00e9 pr\u00e9voient des dispositions d\u00e9taillant le suivi et la production de rapports annuels concernant les travaux de r\u00e9paration et d&#039;am\u00e9lioration r\u00e9alis\u00e9s, ainsi que les activit\u00e9s pr\u00e9vues pour l&#039;ann\u00e9e suivante.<\/p>\n<p>Recreational resources at the project include a tailrace fishing area and non-project Glenside Park. The project is required to develop a Recreation Management Plan (RMP) within one year of license issuance to address the identified lack of impoundment access and to formalize recreational features. Public access is provided free of charge.<\/p>\n<hr \/>\n<h3>\u00c9tat de conformit\u00e9<\/h3>\n<p><strong>Le certificat comprend les conditions sp\u00e9cifiques \u00e0 l&#039;\u00e9tablissement suivantes :<\/strong><\/p>\n<p><strong>Condition 1<\/strong>Le propri\u00e9taire de l&#039;installation doit soumettre le plan final de suivi de la conformit\u00e9 op\u00e9rationnelle (OCMP) \u00e0 LIHI une fois celui-ci approuv\u00e9 par les organismes de gestion des ressources et la FERC. Lors de ses soumissions annuelles de conformit\u00e9 \u00e0 LIHI, le propri\u00e9taire de l&#039;installation doit fournir un r\u00e9sum\u00e9 de tous les \u00e9carts op\u00e9rationnels, planifi\u00e9s ou non, survenus au cours de l&#039;ann\u00e9e, ainsi que les preuves de consultation des organismes de gestion des ressources et les commentaires re\u00e7us.<\/p>\n<p><strong>Condition 2<\/strong>: The Facility Owner shall submit the final Historic Properties Management Plan (HPMP) to LIHI once it has been approved by the SHPO and FERC. In annual compliance submittals to LIHI, the Facility Owner shall report on any consultation that occurred during the year related to ground-disturbing or other activities subject to the HPMP.<\/p>\n<p><strong>\u00c9tat 3<\/strong>: The Facility Owner shall submit the Recreation Management Plan (RMP) to LIHI once it has been approved by resource agencies and FERC. In annual compliance submittals to LIHI, the Facility Owner shall report on any required maintenance, development of sites or other activities subject to the RMP.<\/p>\n<p><strong>2026:<\/strong> Le rapport annuel pour le certificat actuel n\u2019est pas encore entr\u00e9 en vigueur.<\/p>\n<hr \/>\n<h3>Historique des certifications<\/h3>\n<p><strong>18 ao\u00fbt 2026 :<\/strong> The Low Impact Hydropower Institute has preliminarily approved Low Impact recertification for the Cross Power Hydroelectric Project. The mid-term review applications and reviewer report are available below. The certification includes three conditions included in the review report to ensure that FERC relicensing implementation measures are timely met.\u00a0The decision is preliminary pending the 30-day appeal window. Only those who commented on the initial application during the 60-day comment period are eligible to file an appeal. Such appeal needs to include an explanation as to how the Project does not meet the LIHI criteria. Appeal requests can be submitted by email to <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> Veuillez envoyer votre demande par courriel en indiquant \u201c\u00a0Projet Cross Power\u00a0\u201d dans l\u2019objet, ou par courrier \u00e0 l\u2019adresse suivante\u00a0: Low Impact Hydropower Institute, 68 Harrison Ave Ste 605, PMB 113938 Boston, Massachusetts 02111-1929. Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre, et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 h, heure de l&#039;Est, le 17 septembre 2026. <\/strong>Si aucune demande d&#039;appel n&#039;est re\u00e7ue, la nouvelle p\u00e9riode de certification s&#039;\u00e9tendra du 31 ao\u00fbt 2026 au 30 ao\u00fbt 2036.<\/p>\n<p><strong>28 avril 2026 : <\/strong>L\u2019Institut de l\u2019hydro\u00e9lectricit\u00e9 \u00e0 faible impact (LIHI) a re\u00e7u un dossier de demande complet (voir ci-dessous) pour un examen \u00e0 mi-parcours du projet Cross Power. Ce projet fait partie des nombreux projets certifi\u00e9s LIHI situ\u00e9s sur le cours sup\u00e9rieur de la rivi\u00e8re Androscoggin, dans le New Hampshire, qui ont obtenu de nouvelles autorisations de la FERC en septembre 2025. Conform\u00e9ment \u00e0 la section 5.3.4 de la 2e \u00e9dition du Manuel LIHI, la d\u00e9livrance d\u2019une nouvelle autorisation constitue un \u201c\u00a0changement important\u00a0\u201d et d\u00e9clenche un examen \u00e0 mi-parcours de la certification LIHI.<\/p>\n<p><strong>\u00a0<\/strong>LIHI sollicite l&#039;avis du public sur cette demande. Plus pr\u00e9cis\u00e9ment, nous souhaitons savoir si vous estimez que le projet continue de satisfaire aux crit\u00e8res de certification \u00e0 faible impact de LIHI, tels que r\u00e9vis\u00e9s dans la 2e \u00e9dition du manuel. Les commentaires directement li\u00e9s \u00e0 des crit\u00e8res sp\u00e9cifiques de LIHI (d\u00e9bits, qualit\u00e9 de l&#039;eau, etc.) sont les bienvenus., <span class='tooltipsall tooltip_post_id_5566 classtoolTips59'>passage des poissons<\/span>, etc.) seront tr\u00e8s utiles, mais tous les commentaires seront pris en compte. Les commentaires peuvent \u00eatre envoy\u00e9s au LIHI par courrier \u00e9lectronique \u00e0 l&#039;adresse\u00a0<a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u201c Commentaires sur les \u00e9nergies crois\u00e9es \u201d dans l\u2019objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 68 Harrison Ave. Ste 605, PMB 113938, Boston MA 02111-1929.\u00a0<strong>Les commentaires doivent \u00eatre re\u00e7us avant 17 h, heure de l&#039;Est, le 27 juin 2026 pour \u00eatre pris en compte. <\/strong>Tous les commentaires seront publi\u00e9s sur le site web et les candidats auront la possibilit\u00e9 d&#039;y r\u00e9pondre. Toute r\u00e9ponse sera \u00e9galement publi\u00e9e.<\/p>\n<p><strong>1er janvier 2022 :<\/strong> La dur\u00e9e du certificat LIHI a \u00e9t\u00e9 prolong\u00e9e conform\u00e9ment \u00e0 la r\u00e9vision 2.05 du manuel de certification LIHI 2e \u00e9dition publi\u00e9 le 1er janvier 2022. Reportez-vous au tableau des \u00e9tablissements ci-dessus pour conna\u00eetre la nouvelle dur\u00e9e.<\/p>\n<p><strong>30 novembre 2020 :<\/strong> La d\u00e9cision de certification du projet Cross Power est devenue d\u00e9finitive apr\u00e8s la cl\u00f4ture de la p\u00e9riode d&#039;appel, le 27 novembre 2020, sans qu&#039;aucun appel n&#039;ait \u00e9t\u00e9 d\u00e9pos\u00e9. La p\u00e9riode de certification s&#039;\u00e9tend du 31 ao\u00fbt 2020 au 30 ao\u00fbt 2025.<\/p>\n<p><strong>27 octobre 2020 :<\/strong>Le Low Impact Hydropower Institute (LIHI) a approuv\u00e9 la certification \u00ab\u00a0faible impact\u00a0\u00bb pour les projets hydro\u00e9lectriques Sawmill, Cross Power, Upper Gorham et Shelburne, situ\u00e9s sur la rivi\u00e8re Androscoggin, dans le New Hampshire. Cette d\u00e9cision est provisoire et attend la fin du d\u00e9lai d&#039;appel de 30\u00a0jours. Seuls les intervenants ayant comment\u00e9 la demande initiale pendant ce d\u00e9lai de 60\u00a0jours sont autoris\u00e9s \u00e0 d\u00e9poser un recours. Ce recours doit inclure une explication expliquant en quoi le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes de recours pour un ou plusieurs de ces projets peuvent \u00eatre soumises par courriel \u00e0 l&#039;adresse suivante\u00a0: <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u00ab\u00a0Projets sur la rivi\u00e8re Androscoggin-NH\u00a0\u00bb en objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. Toutes les demandes seront publi\u00e9es sur le site web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre, et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 heures, heure de l\u2019Est, le 27 novembre 2020.<\/strong>Le dossier de candidature complet et le rapport d&#039;\u00e9valuation sont disponibles ci-dessous. Si aucune demande d&#039;appel n&#039;est re\u00e7ue, la p\u00e9riode de certification pour chaque projet sera du 31 ao\u00fbt 2020 au 30 ao\u00fbt 2025.<\/p>\n<p><strong>13 ao\u00fbt 2020 :<\/strong> L\u2019Institut de l\u2019hydro\u00e9lectricit\u00e9 \u00e0 faible impact (LIHI) a re\u00e7u un dossier complet de demande de certification \u00e0 faible impact pour les projets hydro\u00e9lectriques de Sawmill, Cross Power, Upper Gorham et Shelburne, situ\u00e9s sur la rivi\u00e8re Androscoggin, dans le New Hampshire. Le LIHI sollicite l\u2019avis du public sur cette demande. Plus pr\u00e9cis\u00e9ment, nous souhaitons savoir si, selon vous, ces projets r\u00e9pondent aux crit\u00e8res de certification \u00e0 faible impact du LIHI, tels que r\u00e9vis\u00e9s dans la 2e \u00e9dition du manuel. Le dossier de demande est disponible ci-dessous. Les commentaires portant directement sur des crit\u00e8res sp\u00e9cifiques du LIHI (d\u00e9bits, qualit\u00e9 de l\u2019eau, passage des poissons, etc.) seront particuli\u00e8rement utiles, mais tous les commentaires seront pris en compte. Vous pouvez soumettre vos commentaires \u00e0 l\u2019Institut par courriel \u00e0 l\u2019adresse suivante\u00a0: <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u00ab Commentaires sur le projet Androscoggin River-NH \u00bb dans la ligne d&#039;objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. <strong>Les commentaires doivent \u00eatre re\u00e7us au plus tard \u00e0 17 h, heure de l\u2019Est, le 12 octobre 2020 pour \u00eatre pris en compte.<\/strong> Tous les commentaires seront publi\u00e9s sur le site Web et le candidat aura la possibilit\u00e9 d&#039;y r\u00e9pondre. Toute r\u00e9ponse sera \u00e9galement publi\u00e9e.<\/p>\n<hr \/>\n<h3>Dossiers de certification<\/h3>\n<h4>Bilan de mi-mandat 2026<\/h4>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/10\/Mid-Term-Review-Cross-Power-Hydroelectric-Project-7626.pdf\">Rapport d&#039;examen \u00e0 mi-mandat intercommunal<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20260203-Upper-Andro-LIHI-Mid-Term-Review-Application.pdf\">Demande de r\u00e9vision \u00e0 mi-parcours du projet Androscoggin River<\/a><\/li>\n<\/ul>\n<h4>Certification 2020<\/h4>\n<ul style=\"color: black;\">\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/11\/Berlin-NH-Projects-Certification-Review-2020.pdf\">Examen de la certification des projets Berlin NH 2020<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/12\/20200831-Berlin-NH-Revised-LIHI-Application.pdf\">Demande de certification des projets NH de Berlin 2020<\/a><\/li>\n<\/ul>\n<hr \/>\n<h3>Documents cl\u00e9s<\/h3>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20250909-Cross-Power-FERC-license-and-WQC.pdf\">Licence FERC et certificat de qualit\u00e9 de l&#039;eau de Cross Power 2025<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20241007-Cross-Power-FEA-final.pdf\">\u00c9valuation environnementale FERC de Cross Power 2024<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/06\/20220801-5028_GLHA-Volume-II-FLA.pdf\">Demande de licence finale de Great Lake Hydro America pour 2022 - Annexe E<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Project Name Cross Power LIHI Certificate No. 174 LIHI Certificate Term August 31, 2026 &#8211; August 30, 2036 Owner Great Lakes Hydro America, LLC, a subsidiary<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":3,"featured_media":-1,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"class_list":["post-3746","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages\/3746","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=3746"}],"version-history":[{"count":12,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages\/3746\/revisions"}],"predecessor-version":[{"id":10759,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages\/3746\/revisions\/10759"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=3746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}