{"id":1508,"date":"2020-07-25T17:03:19","date_gmt":"2020-07-25T21:03:19","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?page_id=1508"},"modified":"2025-12-08T13:32:42","modified_gmt":"2025-12-08T18:32:42","slug":"lihi-certificate-107-carver-falls-hydroelectric-project-vermont","status":"publish","type":"page","link":"https:\/\/lowimpacthydro.org\/fr\/lihi-certificate-107-carver-falls-hydroelectric-project-vermont\/","title":{"rendered":"Certificat LIHI #107 \u2013 Projet hydro\u00e9lectrique de Carver Falls, Vermont"},"content":{"rendered":"<table class=\"alignright\" style=\"width: 351px; border: 2px; cellspacing: 2px; cellpadding: 2px; margin-left: 50px;\">\n<tbody>\n<tr>\n<td style=\"width: 37.6106%;\"><strong>Nom du projet<\/strong><\/td>\n<td style=\"width: 60.3982%;\">Chutes Carver<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 37.6106%;\"><strong>Num\u00e9ro de certificat LIHI<\/strong><\/td>\n<td style=\"width: 60.3982%;\">107<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 37.6106%;\"><strong>Dur\u00e9e du certificat LIHI<br \/>\n<\/strong><\/td>\n<td style=\"width: 60.3982%;\">4 d\u00e9cembre 2017 \u2013 3 d\u00e9cembre 2027<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 37.6106%;\"><strong>Propri\u00e9taire<\/strong><\/td>\n<td style=\"width: 60.3982%;\">Soci\u00e9t\u00e9 d&#039;\u00e9nergie de Green Mountain<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 37.6106%;\"><strong>\u00c9tat<\/strong><\/td>\n<td style=\"width: 60.3982%;\">Vermont<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 37.6106%;\"><strong>Emplacement<\/strong><\/td>\n<td style=\"width: 60.3982%;\">Situ\u00e9 dans les villes de Fair Haven et West Haven, comt\u00e9 de Rutland, Vermont, et dans la ville de Hampton, comt\u00e9 de Washington, New York, au mile 3,8 sur la rivi\u00e8re Poultney.<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 37.6106%;\"><strong>Capacit\u00e9 install\u00e9e<\/strong><\/td>\n<td style=\"width: 60.3982%;\">2,251 MW<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 37.6106%;\"><strong>G\u00e9n\u00e9ration annuelle moyenne<\/strong><\/td>\n<td style=\"width: 60.3982%;\">6 578 MWH (moyenne sur 5 ans)<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 37.6106%;\"><strong>Type d&#039;\u00e9tablissement<\/strong><\/td>\n<td style=\"width: 60.3982%;\"><span class='tooltipsall tooltip_post_id_5643 classtoolTips52'>Au fil de l&#039;eau<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 37.6106%;\"><strong><span class='tooltipsall tooltip_post_id_5565 classtoolTips152'>F\u00e9d\u00e9ration internationale de radio-t\u00e9l\u00e9vision (FERC)<\/span> Non.<\/strong><\/td>\n<td style=\"width: 60.3982%;\">P-11475 d\u00e9livr\u00e9 en 2009, expire le 31\/01\/2039<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Le projet Carver Falls est situ\u00e9 dans les villes de Fair Haven et West Haven, dans le comt\u00e9 de Rutland, dans le Vermont, et dans la ville de Hampton, dans le comt\u00e9 de Washington, dans l&#039;\u00c9tat de New York, sur la rivi\u00e8re Poultney. La rivi\u00e8re forme une partie de la fronti\u00e8re entre le Vermont et l&#039;\u00c9tat de New York et se jette dans l&#039;extr\u00e9mit\u00e9 sud du lac Champlain.<\/p>\n<p>Carver Falls est la plus haute chute d&#039;eau majeure du Vermont et contient deux chutes \u00e0 la <span class='tooltipsall tooltip_post_id_5581 classtoolTips154'>t\u00eate<\/span> d&#039;une gorge calcaire. Les chutes ont \u00e9t\u00e9 modifi\u00e9es par le d\u00e9veloppement hydro\u00e9lectrique depuis 1894. Pendant 100 ans avant cette date, elles ont \u00e9t\u00e9 exploit\u00e9es pour faire fonctionner les moulins. La rivi\u00e8re en amont des chutes se trouve dans un ravin de 100 pieds de profondeur. En aval des chutes, le ravin a une profondeur de 200 pieds. Une grotte dans une falaise calcaire au-dessus du ravin est situ\u00e9e \u00e0 environ un mile en dessous des chutes. Le projet appartient \u00e0 Green Mountain Power (GMP), le premier service public d&#039;\u00e9nergie certifi\u00e9 comme <a href=\"https:\/\/bcorporation.net\/\">Soci\u00e9t\u00e9 B.<\/a><\/p>\n<p>Le projet comprend : une <span class='tooltipsall tooltip_post_id_5545 classtoolTips158'>barrage<\/span>, deux <span class='tooltipsall tooltip_post_id_5651 classtoolTips116'>d\u00e9versoirs<\/span>, <span class='tooltipsall tooltip_post_id_5619 classtoolTips124'>conduite forc\u00e9e<\/span>, <span class='tooltipsall tooltip_post_id_5624 classtoolTips102'>centrale<\/span>, deux turbines et un tron\u00e7on contourn\u00e9.<\/p>\n<p>Le barrage est situ\u00e9 au sommet de la chute de 80 pieds des chutes Carver, avec un <span class='tooltipsall tooltip_post_id_5514 classtoolTips118'>pilier<\/span> sur la rive du Vermont et l&#039;autre cul\u00e9e sur la rive de New York. La centrale \u00e9lectrique, \u00e0 plusieurs centaines de pieds en aval des chutes, se trouve du c\u00f4t\u00e9 new-yorkais de la rivi\u00e8re. Le barrage est fait de b\u00e9ton et de ma\u00e7onnerie de pierre, mesure 514 pieds de long et comporte deux <span class='tooltipsall tooltip_post_id_5651 classtoolTips116'>d\u00e9versoir<\/span> sections. Le d\u00e9versoir nord mesure 110 pieds de long et est surmont\u00e9 d&#039;un <span class='tooltipsall tooltip_post_id_5569 classtoolTips79'>tableaux d&#039;affichage<\/span>Le d\u00e9versoir sud mesure 150 pieds de long et est surmont\u00e9 de planches de 1,5 pied. La conduite forc\u00e9e en acier mesure 220 pieds de long et 7 pieds de diam\u00e8tre. Elle se divise en deux conduites de 132 pieds de long et de 3 \u00e0 4 pieds de diam\u00e8tre. <span class='tooltipsall tooltip_post_id_5619 classtoolTips124'>conduites forc\u00e9es<\/span>Deux r\u00e9servoirs de surpression en acier sont situ\u00e9s \u00e0 environ 20 pieds sous le point de bifurcation, un pour chaque conduite forc\u00e9e. Une vanne papillon est situ\u00e9e dans la conduite forc\u00e9e de 4 pieds sous le r\u00e9servoir de surpression. Les deux r\u00e9servoirs de surpression ont une hauteur de 44 pieds et des diam\u00e8tres respectifs de 72 pouces et 48 pouces. La centrale \u00e9lectrique contient deux groupes \u00e9lectrog\u00e8nes \u00e0 turbine d&#039;une capacit\u00e9 install\u00e9e totale de 2,251 MW. L&#039;\u00e9lectricit\u00e9 du projet est transmise par une ligne de transmission de 2,4 kilovolts de 275 pieds de long connect\u00e9e au r\u00e9seau r\u00e9gional. La port\u00e9e de d\u00e9rivation mesure 700 pieds de long et comprend la gorge rocheuse occup\u00e9e par les chutes et la <span class='tooltipsall tooltip_post_id_5620 classtoolTips86'>piscine de plong\u00e9e<\/span> \u00e0 sa base. Il comprend \u00e9galement les zones imm\u00e9diatement adjacentes sur la rive gauche de la rivi\u00e8re qui sont actuellement occup\u00e9es par le r\u00e9seau \u00e9lectrique <span class='tooltipsall tooltip_post_id_5656 classtoolTips92'>sous-station<\/span> et d\u2019autres installations du projet.<\/p>\n<p>Le projet op\u00e8re dans un <span class='tooltipsall tooltip_post_id_5643 classtoolTips52'>au fil de l&#039;eau<\/span> Le projet pr\u00e9voit un d\u00e9bit de d\u00e9rivation minimum de 50 pi3\/s du 1er avril au 15 mai et fournit par ailleurs un d\u00e9bit de d\u00e9rivation minimum de 18,5 pi3\/s. Ce r\u00e9gime d&#039;\u00e9coulement a \u00e9t\u00e9 \u00e9labor\u00e9 en consultation avec le D\u00e9partement de la conservation de l&#039;environnement de l&#039;\u00c9tat de New York (NYSDEC) et l&#039;Agence des ressources naturelles du Vermont (VANR). Les jauges de surveillance sur le site aident \u00e0 garantir les op\u00e9rations au fil de l&#039;eau et permettent des ajustements \u00e0 distance ainsi que la tenue d&#039;enregistrements horaires des donn\u00e9es du projet.<\/p>\n<p>Les eaux situ\u00e9es dans la zone d\u2019\u00e9tude du projet sont class\u00e9es en classe B et d\u00e9grad\u00e9es en raison de la teneur \u00e9lev\u00e9e en mercure des populations de dor\u00e9s jaunes et de la pr\u00e9sence de ch\u00e2taignes d\u2019eau, une esp\u00e8ce envahissante. Les eaux de classe B sont g\u00e9r\u00e9es pour l\u2019habitat aquatique, l\u2019esth\u00e9tique, l\u2019approvisionnement en eau public et les loisirs de contact primaire. La consultation avec VANR a conclu que le projet ne contribue pas aux limitations de la qualit\u00e9 de l\u2019eau. La rivi\u00e8re Lower Poultney est l\u2019une des quatre ressources en eau exceptionnelles (ORW) du Vermont. Sur la base de cette d\u00e9signation, VANR a \u00e9labor\u00e9 un plan de gestion pour la rivi\u00e8re Lower Poultney qui a \u00e9tabli l\u2019objectif suivant : \u00ab Pour cette partie de la rivi\u00e8re Lower Poultney \u00e0 l\u2019int\u00e9rieur des fronti\u00e8res du Vermont, l\u2019\u00c9tat cherchera \u00e0 g\u00e9rer certaines activit\u00e9s affectant la qualit\u00e9 de l\u2019eau, les d\u00e9bits, le cours, le courant et la section transversale de la rivi\u00e8re Lower Poultney afin de pr\u00e9server et d\u2019am\u00e9liorer les valeurs naturelles, culturelles, pittoresques et r\u00e9cr\u00e9atives exceptionnelles de la rivi\u00e8re et du corridor fluvial. \u00bb<\/p>\n<p>Historiquement, la cascade sur laquelle le projet est situ\u00e9 agit comme une barri\u00e8re naturelle en amont <span class='tooltipsall tooltip_post_id_5566 classtoolTips59'>passage des poissons<\/span>. Cependant, le VANR a not\u00e9 que l&#039;anguille d&#039;Am\u00e9rique a pu remonter les chutes et peut \u00eatre trouv\u00e9e en amont du projet. Le Fish and Wildlife Service des \u00c9tats-Unis participe activement \u00e0 un projet de restauration de l&#039;anguille d&#039;Am\u00e9rique dans le bassin du lac Champlain, mais n&#039;a pas encore prescrit de mesures de passage dans les affluents du lac Champlain. Le tron\u00e7on en aval du projet, une p\u00eacherie en eau chaude, est une importante zone de frai pour le dor\u00e9 jaune et a historiquement soutenu les populations d&#039;anguilles d&#039;Am\u00e9rique. Le tron\u00e7on en amont du projet accueille une p\u00eacherie en eau froide. Les esp\u00e8ces r\u00e9sidentes ne prosp\u00e9reraient pas dans le tron\u00e7on en aval de la rivi\u00e8re. Des grilles \u00e0 d\u00e9chets espac\u00e9es de 1,75 pouce et \u00e0 faible vitesse d&#039;admission att\u00e9nuent <span class='tooltipsall tooltip_post_id_5558 classtoolTips77'>entra\u00eenement<\/span>.<\/p>\n<p>Les terres du projet s&#039;\u00e9tendent sur un peu moins de 100 acres. Les tron\u00e7ons en amont et en aval sont fortement bois\u00e9s et comprennent un corridor plus large avec <span class='tooltipsall tooltip_post_id_5571 classtoolTips30'><span class='tooltipsall tooltip_post_id_5572 classtoolTips80'>plaine inondable<\/span> for\u00eat<\/span>, <span class='tooltipsall tooltip_post_id_5670 classtoolTips125'>zones humides<\/span> avec naturel <span class='tooltipsall tooltip_post_id_5635 classtoolTips115'>riverain<\/span> La v\u00e9g\u00e9tation est dense, le corridor de migration de la faune est ininterrompu et la biodiversit\u00e9 est importante. Les op\u00e9rations du projet n&#039;interf\u00e8rent pas avec le plan de gestion ORW de VANR et le projet soutient l&#039;un des plus longs segments du corridor fluvial naturel du Vermont.<\/p>\n<p>Les esp\u00e8ces menac\u00e9es ou en voie de disparition potentiellement pr\u00e9sentes dans les environs du projet comprennent la chauve-souris de l&#039;Indiana, la chauve-souris nordique \u00e0 longues oreilles, le dragon vert, la pr\u00eale des pr\u00e9s, le dard de sable oriental, le dard gris, la moule cylindrique \u00e0 coquille de papier, la moule \u00e0 poche, la moule \u00e0 coquille cannel\u00e9e, la coquille de papier fragile, la coquille de sable noire, la moule \u00e0 talon rose et la moule flottante g\u00e9ante. En consultation avec le NYSDEC et le VANR, la principale strat\u00e9gie d&#039;att\u00e9nuation pour la protection des esp\u00e8ces r\u00e9pertori\u00e9es est que le projet poursuive ses op\u00e9rations au fil de l&#039;eau. La principale pr\u00e9occupation pour les esp\u00e8ces de chauves-souris r\u00e9pertori\u00e9es concerne les activit\u00e9s de d\u00e9boisement. Le projet doit consulter les organismes appropri\u00e9s avant d&#039;effectuer toute activit\u00e9 susceptible de perturber l&#039;habitat.<\/p>\n<p>Les propri\u00e9t\u00e9s historiques et les ressources culturelles \u00e0 proximit\u00e9 du projet comprennent plusieurs sites arch\u00e9ologiques, le barrage et les structures annexes. Le projet est ex\u00e9cut\u00e9 dans le cadre d&#039;un plan de gestion des propri\u00e9t\u00e9s historiques qui comprend des proc\u00e9dures de dotation en personnel et de formation, de consultation, de mesures de traitement et de d\u00e9couverte de ressources culturelles\/tombes ou restes humains. Ce plan a \u00e9t\u00e9 \u00e9labor\u00e9 en consultation avec la Division de la pr\u00e9servation historique du Vermont et le Bureau de pr\u00e9servation historique de l&#039;\u00c9tat de New York.<\/p>\n<p>Les ressources r\u00e9cr\u00e9atives du projet comprennent des aires de pique-nique, une plateforme d&#039;observation des chutes, un parcours de portage en canot et des sentiers de randonn\u00e9e. L&#039;acc\u00e8s public est gratuit.<\/p>\n<hr \/>\n<h3>\u00c9tat de conformit\u00e9<\/h3>\n<p><strong>Le certificat comprend les conditions sp\u00e9cifiques \u00e0 l&#039;\u00e9tablissement suivantes :<\/strong><\/p>\n<p><strong><em>Condition partiellement satisfaite en 2020.<\/em> Condition 1 :<\/strong> Le propri\u00e9taire de l&#039;installation doit consulter le Vermont DEC au sujet des op\u00e9rations au fil de l&#039;eau, identifier les am\u00e9liorations n\u00e9cessaires pour assurer le maintien constant de ces op\u00e9rations et soumettre les r\u00e9sultats, y compris les commentaires de l&#039;agence et les am\u00e9liorations op\u00e9rationnelles apport\u00e9es, dans la premi\u00e8re soumission annuelle de conformit\u00e9 apr\u00e8s la certification.<\/p>\n<p><em><strong>Cette partie reste active\u00a0:<\/strong> <\/em>Par la suite, le propri\u00e9taire de l&#039;installation devra inclure un r\u00e9sum\u00e9 de toutes les am\u00e9liorations apport\u00e9es aux soumissions annuelles de conformit\u00e9 \u00e0 LIHI.<\/p>\n<p><strong>Condition 2 :<\/strong>\u00a0 Pendant la dur\u00e9e de cette certification, si un organisme de ressources lance une consultation concernant des mesures de passage ou de protection pour les esp\u00e8ces de poissons migrateurs, le propri\u00e9taire de l&#039;installation doit en informer le LIHI dans les 60 jours, fournir au LIHI une copie de la demande et la r\u00e9ponse du demandeur. Le propri\u00e9taire de l&#039;installation doit r\u00e9sumer l&#039;\u00e9tat d&#039;avancement de toutes les mesures de passage des poissons pr\u00e9vues ou en cours de mise en \u0153uvre dans les soumissions annuelles de conformit\u00e9 au LIHI.<\/p>\n<p><strong>2025:<\/strong> Aucun changement important ni probl\u00e8me de conformit\u00e9 n&#039;a \u00e9t\u00e9 identifi\u00e9. Le projet reste conforme sur la base de l&#039;examen annuel. Pour la condition 1, le projet n&#039;a signal\u00e9 aucune am\u00e9lioration op\u00e9rationnelle suppl\u00e9mentaire. Pour la condition 2, le projet n&#039;a signal\u00e9 aucune activit\u00e9.<\/p>\n<p><strong>2024:<\/strong> Aucun changement important ni probl\u00e8me de conformit\u00e9 n&#039;a \u00e9t\u00e9 identifi\u00e9. Le projet reste conforme sur la base de l&#039;examen annuel. Pour la condition 1, le projet n&#039;a signal\u00e9 aucune am\u00e9lioration op\u00e9rationnelle suppl\u00e9mentaire. Pour la condition 2, le projet n&#039;a signal\u00e9 aucune activit\u00e9.<\/p>\n<p><strong>2023:<\/strong> Aucun changement important ni probl\u00e8me de conformit\u00e9 n&#039;a \u00e9t\u00e9 identifi\u00e9. Le projet reste conforme sur la base de l&#039;examen annuel. Pour la condition 1, le projet n&#039;a signal\u00e9 aucune am\u00e9lioration op\u00e9rationnelle suppl\u00e9mentaire. Pour la condition 2, le projet n&#039;a signal\u00e9 aucune activit\u00e9.<\/p>\n<p><strong>2022:<\/strong> Aucun changement important ni probl\u00e8me de conformit\u00e9 n&#039;a \u00e9t\u00e9 identifi\u00e9. Le projet reste conforme sur la base de l&#039;examen annuel. Pour la condition 1, le projet a fait \u00e9tat d&#039;une consultation continue avec le VDEC, mais aucune am\u00e9lioration op\u00e9rationnelle suppl\u00e9mentaire. Pour la condition 2, le projet n&#039;a fait \u00e9tat d&#039;aucune activit\u00e9.<\/p>\n<p><strong>2021:<\/strong> Aucun changement ni probl\u00e8me de conformit\u00e9 n&#039;a \u00e9t\u00e9 signal\u00e9. Le projet reste conforme sur la base de l&#039;examen annuel. Pour la condition 1, le projet a fait \u00e9tat d&#039;une consultation continue avec le VDEC, mais aucune am\u00e9lioration op\u00e9rationnelle suppl\u00e9mentaire. Pour la condition 2, le projet n&#039;a fait \u00e9tat d&#039;aucune activit\u00e9.<\/p>\n<p><strong>2020:<\/strong> Aucun changement ni probl\u00e8me de conformit\u00e9 n&#039;a \u00e9t\u00e9 signal\u00e9. Le projet reste conforme sur la base de l&#039;examen annuel. Pour la condition 1, le projet a d\u00e9clar\u00e9 la soumission des donn\u00e9es d&#039;exploitation au VDEC, satisfaisant ainsi partiellement \u00e0 la condition. Pour la condition 2, le projet n&#039;a signal\u00e9 aucune activit\u00e9.<\/p>\n<p><strong>2019:<\/strong> Aucun changement ni probl\u00e8me de conformit\u00e9 n&#039;a \u00e9t\u00e9 signal\u00e9. Le projet reste conforme sur la base de l&#039;examen annuel. Pour la condition 1, le projet a d\u00e9clar\u00e9 avoir compil\u00e9 des donn\u00e9es d&#039;exploitation en vue d&#039;une prochaine soumission au VDEC. Pour la condition 2, le projet n&#039;a signal\u00e9 aucune activit\u00e9.<\/p>\n<p><strong>2018:<\/strong> Le rapport annuel pour le certificat actuel n\u2019est pas encore entr\u00e9 en vigueur.<\/p>\n<hr \/>\n<h3>Historique des certifications<\/h3>\n<p><strong>1er janvier 2022 :<\/strong> La dur\u00e9e du certificat LIHI a \u00e9t\u00e9 prolong\u00e9e conform\u00e9ment \u00e0 la r\u00e9vision 2.05 du manuel de certification LIHI 2e \u00e9dition publi\u00e9 le 1er janvier 2022. Reportez-vous au tableau des \u00e9tablissements ci-dessus pour conna\u00eetre la nouvelle dur\u00e9e.<\/p>\n<p><strong>18 janvier 2019 :<\/strong>\u00a0 La d\u00e9cision de recertifier le projet hydro\u00e9lectrique de Carver Falls est d\u00e9finitive. Aucun appel n&#039;a \u00e9t\u00e9 re\u00e7u pendant la p\u00e9riode d&#039;appel qui a pris fin le 17 janvier 2019. La nouvelle p\u00e9riode de certification du projet s&#039;\u00e9tend du 4 d\u00e9cembre 2017 au 3 d\u00e9cembre 2022.<\/p>\n<p><strong>18 d\u00e9cembre 2018 : <\/strong>Le 14 d\u00e9cembre 2018, le Low Impact Hydropower Institute (LIHI) a approuv\u00e9 de mani\u00e8re pr\u00e9liminaire le projet hydro\u00e9lectrique de Carver Falls pour une nouvelle p\u00e9riode de 5 ans de certification \u00e0 faible impact. Cette d\u00e9cision est pr\u00e9liminaire en attendant la p\u00e9riode d&#039;appel de 30 jours. Seuls ceux qui ont comment\u00e9 la demande initiale pendant la p\u00e9riode de commentaires de 60 jours sont \u00e9ligibles pour d\u00e9poser un appel. Un tel appel doit inclure une explication sur la fa\u00e7on dont le projet ne r\u00e9pond pas aux crit\u00e8res du LIHI. Les demandes d&#039;appel peuvent \u00eatre soumises par courrier \u00e9lectronique \u00e0 <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> avec \u00ab Projet hydro\u00e9lectrique de Carver Falls \u00bb dans l&#039;objet du message, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 329 Massachusetts Ave, Suite 2, Lexington, MA 02420. Toutes les demandes seront publi\u00e9es sur le site Web. Le demandeur aura la possibilit\u00e9 de r\u00e9pondre et toute r\u00e9ponse sera \u00e9galement publi\u00e9e. <strong>Les demandes doivent \u00eatre re\u00e7ues avant 17 heures, heure de l\u2019Est, le 17 janvier 2019.\u00a0 <\/strong>Le dossier complet et le rapport des examinateurs sont disponibles ci-dessous. Si aucune demande d&#039;appel n&#039;est re\u00e7ue et que la d\u00e9cision devient d\u00e9finitive, la p\u00e9riode de certification du projet s&#039;\u00e9tendra du 4 d\u00e9cembre 2017 au 3 d\u00e9cembre 2022.<\/p>\n<p><strong>12 novembre 2018 :<\/strong> Le projet hydro\u00e9lectrique de Carver Falls a obtenu une nouvelle prolongation de la dur\u00e9e actuelle du certificat. La nouvelle date d&#039;expiration est le 31 mars 2019.<\/p>\n<p><strong>9 octobre 2018 : <\/strong>Le Low Impact Hydropower Institute a re\u00e7u une demande compl\u00e8te pour une nouvelle p\u00e9riode de certification \u00e0 faible impact pour le projet hydro\u00e9lectrique de Carver Falls (LIHI # 107). Le projet est situ\u00e9 dans les villes de Fair Haven et West Haven, comt\u00e9 de Rutland, Vermont, et dans la ville de Hampton, comt\u00e9 de Washington, New York, au mile 3,8 de la rivi\u00e8re Poultney. Le LIHI sollicite les commentaires du public sur cette demande. Plus pr\u00e9cis\u00e9ment, nous souhaitons savoir si vous pensez que le projet r\u00e9pond aux crit\u00e8res de certification \u00e0 faible impact du LIHI, tels que r\u00e9vis\u00e9s dans le manuel de 2e \u00e9dition. Veuillez consulter le programme et les crit\u00e8res dans le manuel r\u00e9vis\u00e9 du LIHI\u00a0<a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/07\/2nd-Edition-Handbook-Rev.-2.04-2020-04-01.pdf\">Manuel<\/a>\u00a0et consultez ensuite les documents de candidature du projet 2018 ci-dessous. Les commentaires directement li\u00e9s \u00e0 des crit\u00e8res sp\u00e9cifiques du LIHI (d\u00e9bits, qualit\u00e9 de l&#039;eau, passage des poissons, etc.) seront les plus utiles, mais tous les commentaires seront pris en compte. Les commentaires peuvent \u00eatre soumis par courrier \u00e9lectronique \u00e0\u00a0<a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a>\u00a0avec \u00ab Carver Falls Project Comments \u00bb dans la ligne d&#039;objet, ou par courrier adress\u00e9 au Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 2, Lexington, MA 02420.\u00a0 <strong>Les commentaires doivent \u00eatre re\u00e7us \u00e0 l&#039;Institut au plus tard \u00e0 17 heures, heure de l&#039;Est, le 8 d\u00e9cembre 2018.<\/strong>\u00a0\u00e0 prendre en consid\u00e9ration. Tous les commentaires seront publi\u00e9s sur le site Web. Le candidat aura la possibilit\u00e9 de r\u00e9pondre et toute r\u00e9ponse sera \u00e9galement publi\u00e9e.<\/p>\n<p><strong>11 juin 2018 :\u00a0<\/strong>Le projet hydro\u00e9lectrique de Carver Falls a obtenu une prolongation de la dur\u00e9e actuelle du certificat. La nouvelle date d&#039;expiration est le 31 d\u00e9cembre 2018.<\/p>\n<p><strong>3 novembre 2017 :<\/strong>\u00a0Le projet hydro\u00e9lectrique de Carver Falls a obtenu une prolongation de la dur\u00e9e actuelle du certificat. La nouvelle date d&#039;expiration est le 31 mars 2018.<\/p>\n<p><strong>28 mai 2013 :<\/strong> Le projet hydro\u00e9lectrique de Carver Falls a \u00e9t\u00e9 certifi\u00e9 \u00e0 faible impact pour une dur\u00e9e de cinq ans, \u00e0 compter du 4 d\u00e9cembre 2012 et expirant le 4 d\u00e9cembre 2017.<\/p>\n<p><strong>4 f\u00e9vrier 2013 :<\/strong> La p\u00e9riode de commentaires publics sur la demande est termin\u00e9e.<\/p>\n<p><strong>4 d\u00e9cembre 2012 :<\/strong> Green Mountain Power a d\u00e9pos\u00e9 une demande de certification pour le projet Carver Falls. La demande a \u00e9t\u00e9 publi\u00e9e et une p\u00e9riode de commentaires publics a \u00e9t\u00e9 ouverte.<\/p>\n<hr \/>\n<h3>Dossiers de certification<\/h3>\n<h4>Recertification 2018<\/h4>\n<ul style=\"color: black;\">\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/07\/Carver-Falls-2018-Stage-II-Recertification-Report_2018_12_11.pdf\">Rapport de r\u00e9vision de la recertification de Carver Falls 2018<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/07\/Carver-Falls-LIHI-RE-Certification-Application_10-3-2018.pdf\">Demande de recertification pour Carver Falls 2018<\/a><\/li>\n<\/ul>\n<h4>Certification 2012<\/h4>\n<ul style=\"color: black;\">\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/08\/Carver-Falls-Final-Report.pdf\">Rapport d&#039;examen de certification de Carver Falls<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/08\/Carver-Falls_LIHI-Questionnaire.pdf\">Questionnaire de certification de Carver Falls<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/08\/Carver_Falls_-_LIHI_Attachment_B_Resource_Agencies.pdf\">Annexe de demande \u2013 Organismes de ressources<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/08\/Carver_Falls_-_LIHI_Attachment_C_Project_Description.pdf\">Annexe de la demande \u2013 Description du projet<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/08\/Carver-Falls-Historic-Documents.pdf\">Documents historiques sur les chutes Carver<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/08\/Carver-Falls-Operations-Plan-and-Min-Flow-Documents.pdf\">Plan d&#039;exploitation et documents sur le d\u00e9bit minimal de Carver Falls<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/08\/Carver-Falls-Poultney_River_Reserve_Area_Map.pdf\">Carte de la r\u00e9serve de la rivi\u00e8re Poultney de Carver Falls<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/08\/Carver-Falls-Recreation-Documents.pdf\">Documents sur les loisirs de Carver Falls<\/a><\/li>\n<\/ul>\n<hr \/>\n<h3>Documents cl\u00e9s<\/h3>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2023\/06\/2012-08-08-Carver-Falls-License-Amendment.pdf\">Amendement de la FERC de 2012<\/a>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2023\/06\/Carver-Falls-VT-WQC-amendment-2012.pdf\">Modification de la certification de la qualit\u00e9 de l&#039;eau du Vermont en 2012<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2023\/06\/Carver-Falls-NY-WQC-waiver-2012.pdf\">D\u00e9rogation \u00e0 la modification de la certification de la qualit\u00e9 de l&#039;eau de New York 2012<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2023\/06\/Carver-Falls-license-amendment-2011-turbine.pdf\">Amendement de la FERC de 2011<\/a>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2023\/06\/Carver-Falls-VT-WQC-amendment-2010.pdf\">Modification de la certification de la qualit\u00e9 de l&#039;eau du Vermont de 2010<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2023\/06\/Carver-Falls-NY-WQC-amendment-2010.pdf\">Modification de la certification de la qualit\u00e9 de l&#039;eau de New York 2010<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2023\/06\/Carver-Falls-license-2009-original.pdf\">Licence FERC 2009<\/a>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2023\/06\/Carver-Falls-VT-WQC-2008-1.pdf\">Certification de la qualit\u00e9 de l&#039;eau du Vermont 2008<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2023\/06\/1997-Carver-Falls-Environmental-Assessment-1.pdf\">\u00c9valuation environnementale de la FERC de 1997<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2023\/06\/Carver-Falls-NY-WQC-1996-with-Settlement-Agreement.pdf\">Modification de la certification de la qualit\u00e9 de l&#039;eau de New York de 1996 avec accord de r\u00e8glement<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2023\/06\/Carver-Falls-NY-WQC-1995.pdf\">Certification de la qualit\u00e9 de l&#039;eau de New York en 1995<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Project Name Carver Falls LIHI Certificate No. 107 LIHI Certificate Term December 4, 2017 &#8211; December 3, 2027 Owner Green Mountain Power Corporation State Vermont Location<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":3,"featured_media":-1,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"class_list":["post-1508","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages\/1508","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/comments?post=1508"}],"version-history":[{"count":12,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages\/1508\/revisions"}],"predecessor-version":[{"id":10206,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/pages\/1508\/revisions\/10206"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/fr\/wp-json\/wp\/v2\/media?parent=1508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}