Lexington MA (September 27, 2019): The decision to certify the Deer Rips/Androscoggin No. 3 Hydroelectric Project is final. No appeals were received during the appeal period which closed on September 26, 2019. The certification term for the Project (LIHI #163) is from June 17, 2019 through June 16, 2024.