{"id":8690,"date":"2024-04-19T13:48:33","date_gmt":"2024-04-19T17:48:33","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=8690"},"modified":"2024-04-19T13:48:33","modified_gmt":"2024-04-19T17:48:33","slug":"preliminary-decision-certification-of-the-bolton-falls-project-pending-lihi-201-vt","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/es\/preliminary-decision-certification-of-the-bolton-falls-project-pending-lihi-201-vt\/","title":{"rendered":"Decisi\u00f3n preliminar: Certificaci\u00f3n del proyecto Bolton Falls, pendiente de LIHI #201, VT"},"content":{"rendered":"<p><strong>19 de abril de 2024:<\/strong> El Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto (LIHI) ha aprobado preliminarmente la Certificaci\u00f3n de Bajo Impacto para el Proyecto Hidroel\u00e9ctrico Bolton Falls (pendiente de LIHI #201), <span class='tooltipsall tooltip_post_id_5565 classtoolTips152'>Comisi\u00f3n Federal de Comercio<\/span># P-2879. El proyecto est\u00e1 ubicado en el r\u00edo Winooski en Vermont.<\/p>\n<p>Esta decisi\u00f3n es preliminar y est\u00e1 pendiente del per\u00edodo de apelaci\u00f3n de 30 d\u00edas. Solo aquellos que comentaron sobre las solicitudes iniciales durante el per\u00edodo de comentarios de 60 d\u00edas son elegibles para presentar una apelaci\u00f3n. Dicha apelaci\u00f3n debe incluir una explicaci\u00f3n de por qu\u00e9 los proyectos no cumplen con los criterios de LIHI. Las solicitudes de apelaci\u00f3n se pueden enviar por correo electr\u00f3nico a comments@lowimpacthydro.org con \u201cBolton Falls\u201d en la l\u00ednea de asunto, o por correo postal dirigido al Low Impact Hydropower Institute, 1167 Massachusetts Ave, Arlington, MA 02476. Todas las solicitudes se publicar\u00e1n en el sitio web. El solicitante tendr\u00e1 la oportunidad de responder y cualquier respuesta tambi\u00e9n se publicar\u00e1. Las solicitudes deben recibirse antes de las 5 p. m., hora del Este, el 19 de mayo de 2024.<\/p>\n<p>La solicitud completa y el informe del revisor est\u00e1n disponibles <a href=\"https:\/\/lowimpacthydro.org\/es\/bolton-falls-vt\/\">AQU\u00cd<\/a>Si no se reciben solicitudes de apelaci\u00f3n, los plazos de certificaci\u00f3n ser\u00e1n del 26 de enero de 2024 al 25 de enero de 2034.<\/p>","protected":false},"excerpt":{"rendered":"<p>April 19, 2024: The Low Impact Hydropower Institute (LIHI) has preliminarily approved Low Impact Certification for the Bolton Falls (pending LIHI #201) Hydroelectric Project, FERC# P-2879.<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-8690","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/8690","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/comments?post=8690"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/8690\/revisions"}],"predecessor-version":[{"id":8692,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/8690\/revisions\/8692"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media?parent=8690"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/categories?post=8690"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/tags?post=8690"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}