{"id":7243,"date":"2023-04-20T13:04:29","date_gmt":"2023-04-20T17:04:29","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=7243"},"modified":"2023-04-20T13:04:29","modified_gmt":"2023-04-20T17:04:29","slug":"final-decision-recertification-of-the-pelton-round-butte-project-lihi-25-or","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/es\/final-decision-recertification-of-the-pelton-round-butte-project-lihi-25-or\/","title":{"rendered":"Decisi\u00f3n final: recertificaci\u00f3n del proyecto Pelton Round Butte, LIHI #25, OR"},"content":{"rendered":"<p><strong>19 de abril de 2023: <\/strong>El Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto ha emitido una decisi\u00f3n final sobre la recertificaci\u00f3n del Proyecto Hidroel\u00e9ctrico Pelton Round Butte. El plazo de certificaci\u00f3n es del 30 de octubre de 2022 al 29 de octubre de 2035.<\/p>","protected":false},"excerpt":{"rendered":"<p>April 19, 2023: The Low Impact Hydropower Institute has issued a final decision on the recertification of the Pelton Round Butte Hydroelectric Project. The certification term<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[23,19],"tags":[],"class_list":["post-7243","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-certified-facilities","category-news"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/7243","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/comments?post=7243"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/7243\/revisions"}],"predecessor-version":[{"id":7244,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/7243\/revisions\/7244"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media?parent=7243"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/categories?post=7243"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/tags?post=7243"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}