{"id":7135,"date":"2023-03-29T11:19:37","date_gmt":"2023-03-29T15:19:37","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=7135"},"modified":"2023-03-29T11:19:37","modified_gmt":"2023-03-29T15:19:37","slug":"final-decision-certification-of-the-belleville-project-lihi-193-and-meldahl-project-lihi-194-ohio-river","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/es\/final-decision-certification-of-the-belleville-project-lihi-193-and-meldahl-project-lihi-194-ohio-river\/","title":{"rendered":"Decisi\u00f3n final \u2013 Certificaci\u00f3n del Proyecto Belleville (LIHI #193) y el Proyecto Meldahl (LIHI #194), r\u00edo Ohio"},"content":{"rendered":"<p><strong>29 de marzo de 2023:<\/strong> El Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto (LIHI) ha emitido sus decisiones finales sobre la certificaci\u00f3n de los Proyectos Hidroel\u00e9ctricos Belleville y Meldahl. Los proyectos se ubican en el r\u00edo Ohio, en Ohio y Virginia Occidental (Bellville), y en Ohio y Kentucky (Meldahl). Los proyectos ya est\u00e1n certificados por LIHI. La fecha de entrada en vigor de cada uno es el 21 de septiembre de 2022 por un per\u00edodo de diez a\u00f1os, que finalizar\u00e1 el 20 de septiembre de 2032. Puede encontrar informaci\u00f3n sobre los proyectos, incluida la solicitud completa, en el sitio web de LIHI a trav\u00e9s de los enlaces del proyecto: <a href=\"https:\/\/lowimpacthydro.org\/es\/belleville-project\/\">Proyecto hidroel\u00e9ctrico Belleville<\/a> y <a href=\"https:\/\/lowimpacthydro.org\/es\/meldahl-project\/\">Proyecto Hidroel\u00e9ctrico Meldahl.<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>March 29, 2023: The Low Impact Hydropower Institute has issued final decisions on the certification of the Belleville and Meldahl Hydroelectric Projects. The projects are located<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[23,19],"tags":[],"class_list":["post-7135","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-certified-facilities","category-news"],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/7135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/comments?post=7135"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/7135\/revisions"}],"predecessor-version":[{"id":7136,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/7135\/revisions\/7136"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media?parent=7135"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/categories?post=7135"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/tags?post=7135"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}