{"id":7083,"date":"2023-03-13T11:38:27","date_gmt":"2023-03-13T15:38:27","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=7083"},"modified":"2023-03-13T11:38:27","modified_gmt":"2023-03-13T15:38:27","slug":"preliminary-decision-certification-of-the-south-berwick-project-pending-195-nh-me","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/es\/preliminary-decision-certification-of-the-south-berwick-project-pending-195-nh-me\/","title":{"rendered":"Decisi\u00f3n preliminar \u2013 Certificaci\u00f3n del Proyecto South Berwick, pendiente #195, NH\/ME"},"content":{"rendered":"<p><strong>13 de marzo de 2023:<\/strong> El Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto (LIHI) aprob\u00f3 preliminarmente la Certificaci\u00f3n de Bajo Impacto para el Proyecto Hidroel\u00e9ctrico South Berwick (pendiente de LIHI #195). El proyecto se ubica en el r\u00edo Salmon Falls, en New Hampshire y Maine. La solicitud completa y el informe del revisor est\u00e1n disponibles. <a href=\"https:\/\/lowimpacthydro.org\/es\/south-berwick-project-new-hampshire-maine\/\">AQU\u00cd<\/a>.<\/p>\n<p>Esta decisi\u00f3n es preliminar, a la espera del plazo de apelaci\u00f3n de 30 d\u00edas. Solo quienes comentaron sobre las solicitudes iniciales durante el plazo de 60 d\u00edas pueden presentar una apelaci\u00f3n. Dicha apelaci\u00f3n debe incluir una explicaci\u00f3n de por qu\u00e9 los Proyectos no cumplen con los criterios de LIHI. Las solicitudes de apelaci\u00f3n pueden enviarse por correo electr\u00f3nico a <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> Con el asunto &quot;South Berwick Project&quot;, o por correo postal dirigido al Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto, 1167 Massachusetts Ave, Arlington, MA 02476. Todas las solicitudes se publicar\u00e1n en el sitio web. El solicitante tendr\u00e1 la oportunidad de responder, y cualquier respuesta tambi\u00e9n se publicar\u00e1. <strong>Las solicitudes deben recibirse antes de las 5 p. m., hora del Este, el 12 de abril de 2023.<\/strong><\/p>\n<p>Si no se reciben solicitudes de apelaci\u00f3n, los t\u00e9rminos de certificaci\u00f3n ser\u00e1n del 8 de diciembre de 2022 al 7 de diciembre de 2032.<\/p>","protected":false},"excerpt":{"rendered":"<p>March 13, 2023: The Low Impact Hydropower Institute (LIHI) preliminarily approved Low Impact Certification for the South Berwick (pending LIHI #195) Hydroelectric Project. The project is<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-7083","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/7083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/comments?post=7083"}],"version-history":[{"count":1,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/7083\/revisions"}],"predecessor-version":[{"id":7085,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/7083\/revisions\/7085"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media?parent=7083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/categories?post=7083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/tags?post=7083"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}