{"id":6785,"date":"2022-12-08T15:31:23","date_gmt":"2022-12-08T20:31:23","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=6785"},"modified":"2022-12-08T15:31:23","modified_gmt":"2022-12-08T20:31:23","slug":"complete-application-received-south-berwick-project-nh-me","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/es\/complete-application-received-south-berwick-project-nh-me\/","title":{"rendered":"Solicitud completa recibida \u2013 Proyecto South Berwick, NH\/ME"},"content":{"rendered":"<p><strong>8 de diciembre de 2022: <\/strong>El Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto ha recibido una solicitud completa de Green Mountain Power Corporation para el Proyecto Hidroel\u00e9ctrico South Berwick ubicado en el r\u00edo Salmon Falls en New Hampshire y Maine.<\/p>\n<p>LIHI solicita comentarios del p\u00fablico sobre esta solicitud. En concreto, nos interesa saber si considera que el Proyecto cumple con los Criterios de Certificaci\u00f3n de Bajo Impacto de LIHI, revisados en la 2.\u00aa edici\u00f3n del Manual. Puede encontrar la documentaci\u00f3n de la solicitud del Proyecto. <a href=\"https:\/\/lowimpacthydro.org\/es\/south-berwick-project-new-hampshire-maine\/\">AQU\u00cd<\/a>.<\/p>\n<p>Comentarios que est\u00e1n directamente relacionados con criterios espec\u00edficos de LIHI (caudales, calidad del agua, <span class='tooltipsall tooltip_post_id_5566 classtoolTips59'>paso de peces<\/span>, etc.) ser\u00e1n de gran ayuda, pero se tendr\u00e1n en cuenta todos los comentarios. Los comentarios pueden enviarse al Instituto por correo electr\u00f3nico a\u00a0<a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a>\u00a0con \u201cComentarios del Proyecto South Berwick\u201d en la l\u00ednea de asunto, o por correo dirigido al Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476.\u00a0 <strong>Los comentarios deben recibirse antes de las 5:00 p. m., hora del Este, el 6 de febrero de 2023.<\/strong>\u00a0Se considerar\u00e1n todos los comentarios. Se publicar\u00e1n en el sitio web y el solicitante tendr\u00e1 la oportunidad de responder. Tambi\u00e9n se publicar\u00e1n todas las respuestas.<\/p>","protected":false},"excerpt":{"rendered":"<p>December 8, 2022: The Low Impact Hydropower Institute has received a complete application from Green Mountain Power Corporation for the South Berwick Hydroelectric Project located\u00a0on the<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[19,21,22],"tags":[],"class_list":["post-6785","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-pending-applications","category-public-comment-period"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/6785","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/comments?post=6785"}],"version-history":[{"count":2,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/6785\/revisions"}],"predecessor-version":[{"id":6896,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/6785\/revisions\/6896"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media?parent=6785"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/categories?post=6785"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/tags?post=6785"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}