{"id":4805,"date":"2021-10-25T11:06:14","date_gmt":"2021-10-25T15:06:14","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?p=4805"},"modified":"2021-12-08T10:53:44","modified_gmt":"2021-12-08T15:53:44","slug":"final-decision-certification-of-the-narrows-road-pressure-reduction-valve-station-project-lihi-184","status":"publish","type":"post","link":"https:\/\/lowimpacthydro.org\/es\/final-decision-certification-of-the-narrows-road-pressure-reduction-valve-station-project-lihi-184\/","title":{"rendered":"Decisi\u00f3n final \u2013 Certificaci\u00f3n del proyecto de la estaci\u00f3n de v\u00e1lvulas reductoras de presi\u00f3n de Narrows Road, LIHI #184"},"content":{"rendered":"<p><strong>25 de octubre de 2021:<\/strong> El Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto ha emitido una decisi\u00f3n final sobre la certificaci\u00f3n del Proyecto de la Estaci\u00f3n de V\u00e1lvulas Reductoras de Presi\u00f3n de Narrows Road, ubicado en la cuenca del r\u00edo Nashua en Massachusetts. El plazo de apelaci\u00f3n de 30 d\u00edas finaliz\u00f3 el 2 de octubre de 2021 y no se presentaron apelaciones. Por lo tanto, la decisi\u00f3n de certificar el proyecto es definitiva. El plazo de certificaci\u00f3n es del 25 de junio de 2021 al 24 de junio de 2031.<\/p>","protected":false},"excerpt":{"rendered":"<p>October 25, 2021: The Low Impact Hydropower Institute has issued a final decision on the certification of the Narrows Road Pressure Reduction Valve Station Project located<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":4,"featured_media":4088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[23,19],"tags":[],"class_list":["post-4805","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-certified-facilities","category-news"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/4805","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/comments?post=4805"}],"version-history":[{"count":2,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/4805\/revisions"}],"predecessor-version":[{"id":4897,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/posts\/4805\/revisions\/4897"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media\/4088"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media?parent=4805"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/categories?post=4805"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/tags?post=4805"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}