{"id":5018,"date":"2022-02-03T14:32:20","date_gmt":"2022-02-03T19:32:20","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?page_id=5018"},"modified":"2026-10-14T11:20:06","modified_gmt":"2026-10-14T15:20:06","slug":"lihi-certificate-188-cascade-project-new-hampshire","status":"publish","type":"page","link":"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-188-cascade-project-new-hampshire\/","title":{"rendered":"Certificado LIHI #188 \u2013 Proyecto Cascade, NH"},"content":{"rendered":"<table class=\"alignright\" style=\"width: 351px; border: 2px; cellspacing: 2px; cellpadding: 2px; margin-left: 50px;\">\n<tbody>\n<tr>\n<td style=\"width: 154px;\"><strong>Nombre del proyecto<\/strong><\/td>\n<td style=\"width: 211px;\">Cascada<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 154px;\"><strong>Certificado LIHI No.<\/strong><\/td>\n<td style=\"width: 211px;\">188<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 154px;\"><strong>Plazo del certificado LIHI<\/strong><\/td>\n<td style=\"width: 211px;\">August 31, 2026 &#8211; August 30, 2036<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 154px;\"><strong>Due\u00f1o<\/strong><\/td>\n<td style=\"width: 211px;\">Great Lakes Hydro America, LLC, una subsidiaria de Brookfield Renewable Energy Group<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 154px;\"><strong>Estado<\/strong><\/td>\n<td style=\"width: 211px;\">Nuevo Hampshire<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 154px;\"><strong>Ubicaci\u00f3n<\/strong><\/td>\n<td style=\"width: 211px;\">Ubicado en la milla fluvial 135,6 del r\u00edo Androscoggin en Berl\u00edn y Gorham, condado de Coos<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 154px;\"><strong>Capacidad instalada<\/strong><\/td>\n<td style=\"width: 211px;\">8,115 MW<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 154px;\"><strong>Generaci\u00f3n media anual<\/strong><\/td>\n<td style=\"width: 211px;\">49.897 MWh<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 154px;\"><strong>Tipo de instalaci\u00f3n<\/strong><\/td>\n<td style=\"width: 211px;\"><span class='tooltipsall tooltip_post_id_5643 classtoolTips52'>De pasada<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 154px;\"><strong><span class='tooltipsall tooltip_post_id_5565 classtoolTips152'>Comisi\u00f3n Federal de Comercio<\/span> No.<\/strong><\/td>\n<td style=\"width: 211px;\">El permiso P-2327 se emiti\u00f3 en 2025 y vence el 31\/08\/2065.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>El Proyecto Cascade est\u00e1 ubicado en el r\u00edo Androscoggin, en la ciudad de Berl\u00edn y el pueblo de Gorham, New Hampshire. <span class='tooltipsall tooltip_post_id_5545 classtoolTips158'>presa<\/span> En 1903, la Berlin Mills Company construy\u00f3 una sala de molienda para proporcionar energ\u00eda hidromec\u00e1nica a las actividades de fabricaci\u00f3n de papel. La sala de molienda se convirti\u00f3 en una planta generadora hidroel\u00e9ctrica. <span class='tooltipsall tooltip_post_id_5624 classtoolTips102'>central el\u00e9ctrica<\/span> Entre 1913 y 1918, que incluy\u00f3 la sustituci\u00f3n de las unidades hidromec\u00e1nicas por turbinas\/generadores hidroel\u00e9ctricos. La energ\u00eda hidroel\u00e9ctrica se produjo por primera vez en 1914.<\/p>\n<p>El r\u00edo Androscoggin, con una extensi\u00f3n de 286 kil\u00f3metros, drena 8670 kil\u00f3metros cuadrados en Nuevo Hampshire y Maine. Se une al r\u00edo Kennebec en la bah\u00eda Merrymeeting, en Maine, antes de desembocar en el golfo de Maine y, posteriormente, en el oc\u00e9ano Atl\u00e1ntico. El proyecto es uno de varios proyectos hidroel\u00e9ctricos dentro de un radio de 17,7 kil\u00f3metros del r\u00edo Androscoggin, entre Berl\u00edn y Shelburne, Nuevo Hampshire, incluyendo... <a href=\"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-173-sawmill-hydroelectric-project-new-hampshire\/\">Aserradero (LIHI #173)<\/a>, <a href=\"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-174-cross-power-hydroelectric-project-new-hampshire\/\">Potencia cruzada (LIHI #174)<\/a>, <a href=\"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-175-upper-gorham-hydroelectric-project-new-hampshire\/\">Alto Gorham (LIHI #175)<\/a>, <a href=\"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-153-gorham-hydroelectric-project-new-hampshire\/\">Gorham (LIHI #153)<\/a>, y <a href=\"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-176-shelburne-hydroelectric-project-new-hampshire\/\">Shelburne (LIHI #176)<\/a>.El proyecto Cascade est\u00e1 ubicado justo aguas abajo del <a href=\"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-174-cross-power-hydroelectric-project-new-hampshire\/\">Proyecto Cross Power (LIHI #174)<\/a> e inmediatamente aguas arriba de la <a href=\"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-175-upper-gorham-hydroelectric-project-new-hampshire\/\">Proyecto Upper Gorham (LIHI #175)<\/a>.<\/p>\n<p>La presa tiene la misma configuraci\u00f3n que en 1903. Es una presa de hormig\u00f3n de 583 pies de altura. <span class='tooltipsall tooltip_post_id_5580 classtoolTips81'>presa de gravedad<\/span> compuesto por:<\/p>\n<ul style=\"color: black;\">\n<li>Un hormig\u00f3n de 15 pies de ancho <span class='tooltipsall tooltip_post_id_5514 classtoolTips118'>contrafuerte<\/span> que se extiende unos 20 pies r\u00edo arriba y 30 pies r\u00edo abajo perpendicular al final del <span class='tooltipsall tooltip_post_id_5651 classtoolTips116'>aliviadero<\/span>,<\/li>\n<li>Un <span class='tooltipsall tooltip_post_id_5611 classtoolTips156'>ojiva<\/span> Secci\u00f3n de aliviadero, 313 pies de largo con 3 pies de alto <span class='tooltipsall tooltip_post_id_5569 classtoolTips79'>tableros de flash<\/span>,<\/li>\n<li>Una estructura de compuerta de c\u00e1mara de carga, de 50 metros de largo por 4,5 metros de ancho. Consta de 15 pilares de hormig\u00f3n de 0,9 metros de ancho y una plataforma de hormig\u00f3n con vigas de madera. <span class='tooltipsall tooltip_post_id_5578 classtoolTips153'>puertas<\/span>, cada uno de 9 pies de ancho y 11 pies de alto,<\/li>\n<li>Un estribo adyacente a la estructura de la compuerta de la c\u00e1mara de carga, compuesto por dos muros de contenci\u00f3n de hormig\u00f3n paralelos de 90 cm de ancho con relleno de tierra. Los muros de contenci\u00f3n se extienden aproximadamente 27,5 m, incluyendo 23,5 m ubicados tierra adentro de la ribera.<\/li>\n<li>Una c\u00e1mara de carga, aguas abajo de la estructura de la compuerta de la c\u00e1mara de carga, de aproximadamente 91 metros de largo por 73 metros de ancho, con una profundidad m\u00e1xima de 7,3 metros. El muro de la c\u00e1mara de carga es una estructura de gravedad de hormig\u00f3n que se extiende aproximadamente 100 metros aguas abajo. El muro tiene una altura m\u00e1xima de 12,5 metros, con una coronaci\u00f3n de 1,2 metros y 28 cent\u00edmetros de ancho.<\/li>\n<\/ul>\n<p>Dentro del muro de la antec\u00e1mara se encuentra:<\/p>\n<ul style=\"color: black;\">\n<li>Una puerta profunda ubicada unos 90 pies r\u00edo abajo.<\/li>\n<li>Una compuerta de 4 pies de ancho por 2,5 pies de profundidad ubicada a unos 193 pies r\u00edo abajo.<\/li>\n<li>Una plataforma de hormig\u00f3n ubicada en la parte superior del muro de la c\u00e1mara de carga, que mide 19 pies por 24 pies, para sostener una torre el\u00e9ctrica con l\u00edneas de transmisi\u00f3n.<\/li>\n<li>Una central el\u00e9ctrica de ladrillo y bloque con estructura de acero, que mide 135 pies de largo, 43 pies de ancho y 67 pies de alto con una adici\u00f3n de estructura de concreto que mide 19 pies por 24 pies. Tres <span class='tooltipsall tooltip_post_id_5619 classtoolTips124'>tuber\u00edas forzadas<\/span> plomo de la <span class='tooltipsall tooltip_post_id_5581 classtoolTips154'>cabeza<\/span> puertas a los tres <span class='tooltipsall tooltip_post_id_5576 classtoolTips39'>Turbinas Francis<\/span> con una capacidad combinada de 8,115 MW.<\/li>\n<\/ul>\n<p>Un tramo de derivaci\u00f3n de canal de lecho rocoso de 400 pies de largo se alimenta del agua que pasa sobre el aliviadero.<\/p>\n<p>El proyecto opera en un <span class='tooltipsall tooltip_post_id_5643 classtoolTips52'>de pasada<\/span> mode and impounds a 28-acre reservoir. The impoundment is allowed to fluctuate over a 6-inch range. The project provides a minimum flow of 6 cfs or inflow, whichever is less, through an orifice in the spillway flashboards to provide stable habitat for resident species. This minimum flow regime was developed in consultation with the US Fish and Wildlife Service and New Hampshire Fish and Game Department.<\/p>\n<p>Las aguas dentro del alcance del proyecto se clasifican como de Clase B, aptas para la pesca, la recreaci\u00f3n de contacto primario y el suministro de agua despu\u00e9s del tratamiento. Dichas aguas est\u00e1n catalogadas como contaminadas debido a vertidos previos de varias f\u00e1bricas de papel. Dadas las operaciones de pasada, es improbable que el proyecto afecte negativamente la calidad del agua.<\/p>\n<p>El r\u00edo Androscoggin no es accesible para <span class='tooltipsall tooltip_post_id_5549 classtoolTips96'>di\u00e1dromo<\/span> fish species in the project reach due to downstream natural falls \u2013 Lewiston and Rumford Falls, in the Maine portion of the river. American eel are present in the lower reaches of the Androscoggin River though none have historically reached the upper sections of the river. The project area supports cold-water fishery habitat. New Hampshire Department of Fish and Game annually stocks brook, rainbow, and brown trout upstream of the project. Resident river species include fallfish, smallmouth bass, white sucker, longnose dace, common shiner, spottail shiner, and yellow perch. Downstream passage can occur by means of spillway flow, low-level gate releases, and power intake flow through the trashracks. The project does not impede the successful completion of resident fish life cycles.<\/p>\n<p>The limited project lands consist of those associated with project structures. The project is surrounded by low density residential and commercial development out the outskirts of the City of Berlin. The project\u2019s run-of-river operations provides protection of the shoreline areas. The project is also subject to the New Hampshire Shoreland Water Quality Protection Act which governs shoreland uses within a 250-foot buffer of the high-water mark.<\/p>\n<p>Threatened or endangered species potentially present in the project vicinity include northern long-eared baty, Canada lynx, and the proposed for listing tri-colored bat and monarch butterfly. The project avoids removing trees from April 15 through October 31, unless emergency tree removal for public safety is necessary.<\/p>\n<p>The project\u2019s dam and powerhouse are eligible for listing on the <span class=\"tooltipsall tooltip_post_id_5606 classtoolTips1\" data-hasqtip=\"0\"><span class='tooltipsall tooltip_post_id_5606 classtoolTips1'>Registro Nacional de Lugares Hist\u00f3ricos<\/span><\/span> (NRHP). No Native American lands, known as traditional cultural properties, or NRHP-eligible tribal resources are present within the Project boundary. The project operates under a Programmatic Agreement (PA) in consultation with the State Historic Preservation Office. The PA and related Historic Properties Management Plan (HPMP) provides provisions detailing annual monitoring and reporting concerning repair and improvement activities conducted as well as any scheduled activities for the upcoming year.<\/p>\n<p>No recreational resources are provided in the project\u2019s limited area.\u00a0However, an impoundment access area is owned and operated by the City of Berlin outside the Project boundary. This area provides scenic views, a gravel hand-carry boat access, and bank and boat fishing.<\/p>\n<hr \/>\n<h3>Estado de cumplimiento<\/h3>\n<p><strong>El Certificado incluye las siguientes condiciones espec\u00edficas de la instalaci\u00f3n:<\/strong><\/p>\n<p><strong>Condici\u00f3n 1<\/strong>: The Facility Owner shall submit the final Operational Compliance Monitoring Plan (OCMP) to LIHI once it has been approved by resource agencies and FERC. In annual compliance submittals to LIHI the Facility Owner shall submit a summary of all planned and unplanned operational deviations that occurred during the year along with evidence of resource agency consultation and comments received.<\/p>\n<p><strong>Condici\u00f3n 2<\/strong>: The Facility Owner shall submit the final Historic Properties Management Plan to LIHI once it has been approved by the SHPO and FERC. In annual compliance submittals to LIHI, the Facility Owner shall report on any consultation that occurred during the year related to ground-disturbing or other activities subject to the HPMP.<\/p>\n<p><strong>Condici\u00f3n 3: <\/strong>The Facility Owner shall consult with the City of Berlin on the proposed installation of a safety chain and\/or a gate across the boating put-in at the impoundment access area with safety signage that states when the site is open and closed. If the City feels it is needed, the Facility Owner shall provide LIHI with a plan and schedule for implementation. If the City agrees that a chain\/gate or signage is not needed, the Facility Owner shall provide documented evidence of that agreement.<\/p>\n<p><strong>2026:<\/strong> La presentaci\u00f3n de informes anuales para el Certificado actual a\u00fan no ha entrado en vigor.<\/p>\n<hr \/>\n<h3>Historial de certificaciones<\/h3>\n<p><strong>18 de agosto de 2026:<\/strong> The Low Impact Hydropower Institute has preliminarily approved Low Impact recertification for the Cascade Hydroelectric Project. The mid-term review applications and reviewer report are available below. The certification includes three conditions included in the review report to ensure that FERC relicensing implementation measures are timely met. The decision is preliminary pending the 30-day appeal window. Only those who commented on the initial application during the 60-day comment period are eligible to file an appeal. Such appeal needs to include an explanation as to how the Project does not meet the LIHI criteria. Appeal requests can be submitted by email to <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> Env\u00ede su solicitud con el asunto \u201cProyecto Cascade\u201d o por correo postal a Low Impact Hydropower Institute, 68 Harrison Ave Ste 605, PMB 113938 Boston, Massachusetts 02111-1929. Todas las solicitudes se publicar\u00e1n en el sitio web. El solicitante tendr\u00e1 la oportunidad de responder, y cualquier respuesta tambi\u00e9n se publicar\u00e1. <strong>Las solicitudes deben recibirse antes de las 5 de la tarde, hora del este, del 17 de septiembre de 2026. <\/strong>Si no se reciben solicitudes de apelaci\u00f3n, el nuevo per\u00edodo de certificaci\u00f3n ser\u00e1 del 1 de marzo de 2026 al 29 de febrero de 2036.<\/p>\n<p><strong>28 de abril de 2026:<\/strong> The Low Impact Hydropower Institute has received a complete application (see below) for a mid-term review of the Cascade Project. The Project is one of several LIHI Certified projects located on the upper Androscoggin River in New Hampshire that were issued new FERC licenses in September 2025. In accordance with Section 5.3.4 of the 2nd Edition LIHI Handbook, issuance of a new license constitutes a \u201cmaterial change\u201d and triggers a mid-term LIHI Certification review.\u00a0LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project continues to meet the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook.\u00a0Comments that are directly tied to specific LIHI criteria (flows, water quality, <span class='tooltipsall tooltip_post_id_5566 classtoolTips59'>paso de peces<\/span>, etc.) ser\u00e1n de gran ayuda, pero se tendr\u00e1n en cuenta todos los comentarios. Los comentarios pueden enviarse a LIHI por correo electr\u00f3nico a\u00a0<a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> con \u201cComentarios de Cascade\u201d en el asunto, o por correo postal dirigido al Low Impact Hydropower Institute, 68 Harrison Ave. Ste 605, PMB 113938, Boston MA 02111-1929.\u00a0<strong>Los comentarios deben recibirse antes de las 5 de la tarde, hora del este, del 27 de junio de 2026 para ser tenidos en cuenta. <\/strong>Todos los comentarios se publicar\u00e1n en el sitio web y los solicitantes tendr\u00e1n la oportunidad de responder. Cualquier respuesta tambi\u00e9n se publicar\u00e1.<\/p>\n<p><strong>19 de mayo de 2022:<\/strong> La decisi\u00f3n de certificar el Proyecto Cascade qued\u00f3 firme tras el cierre del plazo de apelaciones el 18 de mayo de 2022, sin que se presentaran apelaciones. El plazo de certificaci\u00f3n es del 1 de marzo de 2022 al 29 de febrero de 2032.<\/p>\n<p><strong>18 de abril de 2022:<\/strong> El Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto (LIHI) ha aprobado preliminarmente el Proyecto Cascade para un per\u00edodo de 10 a\u00f1os de Certificaci\u00f3n de Bajo Impacto. La solicitud completa y el informe del revisor est\u00e1n disponibles a continuaci\u00f3n. Esta decisi\u00f3n es preliminar, a la espera del plazo de apelaci\u00f3n de 30 d\u00edas. Solo quienes comentaron sobre la solicitud inicial durante el plazo de 60 d\u00edas pueden presentar una apelaci\u00f3n. Dicha apelaci\u00f3n debe incluir una explicaci\u00f3n de por qu\u00e9 el Proyecto no cumple con los criterios del LIHI. Las solicitudes de apelaci\u00f3n pueden enviarse por correo electr\u00f3nico a comments@lowimpacthydro.org con el asunto &quot;Cascade Project&quot;, o por correo postal dirigido al Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto, 1167 Massachusetts Ave, Oficina 407, Arlington, MA 02476. Todas las solicitudes se publicar\u00e1n en el sitio web. El solicitante tendr\u00e1 la oportunidad de responder, y cualquier respuesta tambi\u00e9n se publicar\u00e1. <b>Las solicitudes deben recibirse antes de las 5 p. m., hora del Este, del 18 de mayo de 2022. <\/b>Si no se reciben solicitudes de apelaci\u00f3n y la decisi\u00f3n es definitiva, el per\u00edodo de Certificaci\u00f3n del Proyecto ser\u00e1 del 1 de marzo de 2022 al 29 de febrero de 2032.<\/p>\n<p><strong>7 de febrero de 2022:<\/strong> El Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto (LIHI) ha recibido una solicitud completa para la Certificaci\u00f3n de Bajo Impacto del Proyecto Cascade. LIHI solicita comentarios p\u00fablicos sobre esta solicitud. En concreto, nos interesa saber si considera que el Proyecto cumple con los Criterios de Certificaci\u00f3n de Bajo Impacto de LIHI, revisados en la 2.\u00aa edici\u00f3n del Manual. Por favor, revise el programa y los criterios en la versi\u00f3n revisada de LIHI. <a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2021\/12\/2nd-Edition-Handbook-Rev.-2.05-2022-01-01-1.pdf\">Manual<\/a> y luego revise los materiales de solicitud del Proyecto a continuaci\u00f3n. Los comentarios que est\u00e9n directamente relacionados con criterios espec\u00edficos de LIHI (flujos, calidad del agua, paso de peces, etc.) ser\u00e1n de gran ayuda, pero se considerar\u00e1n todos los comentarios. Los comentarios pueden enviarse al Instituto por correo electr\u00f3nico a <a>comments@lowimpacthydro.org<\/a> con \u201cComentarios del Proyecto Cascade\u201d en la l\u00ednea de asunto, o por correo dirigido al Low Impact Hydropower Institute, 1167 Massachusetts Avenue, Arlington, MA 02476. <strong>Los comentarios deben recibirse antes de las 5 p. m., hora del Este, el <strong>8 de abril de 2022<\/strong> Para ser considerado.<\/strong> Todos los comentarios se publicar\u00e1n en el sitio web y el solicitante tendr\u00e1 la oportunidad de responder. Las respuestas tambi\u00e9n se publicar\u00e1n.<\/p>\n<hr \/>\n<h3>Archivos de certificaci\u00f3n<\/h3>\n<h4>Revisi\u00f3n de mitad de per\u00edodo de 2026<\/h4>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/10\/Mid-Term-Review-Cascade-Hydroelectric-Project-71226.pdf\">Informe de revisi\u00f3n intermedia de Cascade<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20260203-Upper-Andro-LIHI-Mid-Term-Review-Application.pdf\">Solicitud de revisi\u00f3n intermedia del r\u00edo Alto Androscoggin<\/a><\/li>\n<\/ul>\n<h4>Certificaci\u00f3n 2022<\/h4>\n<ul style=\"color: black;\">\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2022\/05\/Cascade-Certification-Review-Report-final-2022-04-11.pdf\">Informe de revisi\u00f3n de la certificaci\u00f3n del Proyecto Cascade<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2022\/02\/20211008-Cascade-LIHI-Application.pdf\">Proyecto Cascade \u2013 Solicitud de Certificaci\u00f3n 2022<\/a><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<hr \/>\n<h3>Documentos clave<\/h3>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20250910-Cascade-FERC-license-and-WQC-1.pdf\">Licencia FERC y Certificado de Calidad del Agua de Cascade 2025<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20241007-Cascade-FEA.pdf\">Evaluaci\u00f3n ambiental de la FERC para el proyecto Cascade 2024<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/06\/20220801-5028_GLHA-Volume-II-FLA.pdf\">Solicitud de licencia final de Great Lake Hydro America 2022, Anexo E<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Project Name Cascade LIHI Certificate No. 188 LIHI Certificate Term August 31, 2026 &#8211; August 30, 2036 Owner Great Lakes Hydro America, LLC, a subsidiary of<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":3,"featured_media":-1,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"class_list":["post-5018","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/pages\/5018","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/comments?post=5018"}],"version-history":[{"count":10,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/pages\/5018\/revisions"}],"predecessor-version":[{"id":10941,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/pages\/5018\/revisions\/10941"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media?parent=5018"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}