{"id":3743,"date":"2020-11-25T09:43:22","date_gmt":"2020-11-25T14:43:22","guid":{"rendered":"https:\/\/lowimpacthydro.org\/?page_id=3743"},"modified":"2026-10-27T10:58:02","modified_gmt":"2026-10-27T14:58:02","slug":"lihi-certificate-173-sawmill-hydroelectric-project-new-hampshire","status":"publish","type":"page","link":"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-173-sawmill-hydroelectric-project-new-hampshire\/","title":{"rendered":"Certificado LIHI #173 \u2013 Proyecto Hidroel\u00e9ctrico Sawmill, New Hampshire"},"content":{"rendered":"<table class=\"alignright\" style=\"width: 351px; border: 2px; cellspacing: 2px; cellpadding: 2px; margin-left: 50px;\">\n<tbody>\n<tr>\n<td width=\"162\"><strong>Nombre del proyecto<\/strong><\/td>\n<td width=\"165\">Aserradero<\/td>\n<\/tr>\n<tr>\n<td width=\"162\"><strong>Certificado LIHI No.<\/strong><\/td>\n<td width=\"165\">173<\/td>\n<\/tr>\n<tr>\n<td width=\"162\"><strong>Plazo del certificado LIHI<\/strong><\/td>\n<td width=\"165\">31 de agosto de 2026 \u2013 30 de agosto de 2036<\/td>\n<\/tr>\n<tr>\n<td><strong>Due\u00f1o<\/strong><\/td>\n<td>Great Lakes Hydro America, LLC, una subsidiaria de Brookfield Renewable Energy Group<\/td>\n<\/tr>\n<tr>\n<td><strong>Estado<\/strong><\/td>\n<td>Nuevo Hampshire<\/td>\n<\/tr>\n<tr>\n<td><strong>Ubicaci\u00f3n<\/strong><\/td>\n<td>Milla fluvial 138,2 \u2013 R\u00edo Androscoggin<\/td>\n<\/tr>\n<tr>\n<td><strong>Capacidad instalada<\/strong><\/td>\n<td>3,17 MW<\/td>\n<\/tr>\n<tr>\n<td><strong>Generaci\u00f3n media anual<\/strong><\/td>\n<td>14.529 MWh<\/td>\n<\/tr>\n<tr>\n<td><strong>Tipo de instalaci\u00f3n<\/strong><\/td>\n<td>Flujo de r\u00edo<\/td>\n<\/tr>\n<tr>\n<td><strong><span class='tooltipsall tooltip_post_id_5565 classtoolTips152'>Comisi\u00f3n Federal de Comercio<\/span> No.<\/strong><\/td>\n<td>P-2422, issued in 2025, expires 08\/31\/2065<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>El Proyecto del Aserradero se ubica en el r\u00edo Androscoggin, en el condado de Coos, al norte de Nuevo Hampshire. El r\u00edo Androscoggin atraviesa los estados de Nuevo Hampshire y Maine. Se une al r\u00edo Kennebec en la bah\u00eda Merrymeeting, en Maine, antes de desembocar en el golfo de Maine y posteriormente en el oc\u00e9ano Atl\u00e1ntico. La cuenca del r\u00edo Androscoggin alberga 19 proyectos hidroel\u00e9ctricos ubicados a lo largo de sus 286 kil\u00f3metros de longitud.<\/p>\n<p>El proyecto es uno de varios proyectos hidroel\u00e9ctricos dentro de un alcance de 11 millas del r\u00edo Androscoggin entre Berl\u00edn y Shelburne, New Hampshire, que incluyen: <a href=\"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-174-cross-power-hydroelectric-project-new-hampshire\/\">Potencia cruzada (LIHI #174)<\/a>, Cascada (LIHI #188), <a href=\"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-175-upper-gorham-hydroelectric-project-new-hampshire\/\">Alto Gorham (LIHI #175)<\/a>, <a href=\"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-153-gorham-hydroelectric-project-new-hampshire\/\">Gorham (LIHI #153)<\/a>, y <a href=\"https:\/\/lowimpacthydro.org\/es\/lihi-certificate-176-shelburne-hydroelectric-project-new-hampshire\/\">Shelburne (LIHI #176)<\/a>El aserradero es el proyecto m\u00e1s avanzado en este tramo.<\/p>\n<p>El proyecto incluye una <span class='tooltipsall tooltip_post_id_5545 classtoolTips158'>presa<\/span>, muros de contenci\u00f3n de hormig\u00f3n, toma <span class='tooltipsall tooltip_post_id_5537 classtoolTips143'>canal<\/span>, <span class='tooltipsall tooltip_post_id_5619 classtoolTips124'>compuerta<\/span>, <span class='tooltipsall tooltip_post_id_5624 classtoolTips102'>central el\u00e9ctrica<\/span>y equipos de transmisi\u00f3n. La presa Sawmill se construy\u00f3 originalmente en 1903 y se renov\u00f3 en 1965.<\/p>\n<p>La presa tiene 22 metros de largo y una altura m\u00e1xima de 4,5 metros. Est\u00e1 compuesta por una secci\u00f3n sin rebose de 41 metros de largo, una secci\u00f3n de hormig\u00f3n de 52 metros de largo cuya altura var\u00eda entre 1,8 y 4,2 metros, y una secci\u00f3n de v\u00e1lvula de descarga de 41 metros de largo con cinco v\u00e1lvulas de madera. <span class='tooltipsall tooltip_post_id_5578 classtoolTips153'>puertas<\/span> cada uno de 22 pies de alto y 137 pies de largo <span class='tooltipsall tooltip_post_id_5651 classtoolTips116'>aliviadero<\/span> Secci\u00f3n con bisagra de 7,5 pies <span class='tooltipsall tooltip_post_id_5569 classtoolTips79'>tableros de flash<\/span>y un aliviadero de 44 metros de largo por 3,3 metros de alto con vierteaguas de acero de 53 cm. Un muro de contenci\u00f3n de hormig\u00f3n de 1,2 metros de ancho y 24 metros de largo, en la ribera este del r\u00edo, separa el tramo de derivaci\u00f3n de 0,5 km de longitud del canal de toma de la central el\u00e9ctrica. Un muro de contenci\u00f3n de 1,2 metros de ancho y 17 metros de largo se extiende desde el borde de la central el\u00e9ctrica en la ribera oeste. El canal de toma de 118 metros de largo dirige las entradas a la central el\u00e9ctrica a trav\u00e9s de una tuber\u00eda forzada de acero. La central el\u00e9ctrica es una estructura de ladrillo y bloque, integral a la presa, que contiene:<\/p>\n<ul style=\"color: black;\">\n<li>Cuatro bah\u00edas de entrada de turbinas de 4,25 m de ancho por 5,86 m de largo. Cada bah\u00eda pasa el flujo a trav\u00e9s de rejillas de descarga de 4,25 m de ancho por 5,86 m de alto, cada una con una separaci\u00f3n libre de 7,6 cm.<\/li>\n<li>Cuatro generadores horizontales id\u00e9nticos. Las turbinas 1 y 3 son turbinas de h\u00e9lice de palas fijas Allis-Chalmers. Las turbinas 2 y 4 son unidades de h\u00e9lice de palas ajustables. La capacidad total es de 3,17 MW.<\/li>\n<\/ul>\n<p>El proyecto opera en un marco cuasi-<span class='tooltipsall tooltip_post_id_5643 classtoolTips52'>de pasada<\/span> El proyecto crea un embalse de 72.5 acres. El embalse puede fluctuar en un rango de 6 pulgadas. El proyecto proporciona un caudal m\u00ednimo de 12 pies c\u00fabicos por segundo (cfs) en el tramo desviado para facilitar el paso y proteger los recursos acu\u00e1ticos. Este r\u00e9gimen de caudal se desarroll\u00f3 en colaboraci\u00f3n con el Servicio de Pesca y Vida Silvestre de los Estados Unidos (USFWS) y el Departamento de Servicios Ambientales de New Hampshire (NHDES).<\/p>\n<p>Las aguas dentro del alcance del proyecto se clasifican como de Clase B, aptas para la pesca, la recreaci\u00f3n de contacto primario y el suministro de agua despu\u00e9s del tratamiento. Dichas aguas est\u00e1n catalogadas como contaminadas debido a vertidos previos de varias f\u00e1bricas de papel. Dadas las operaciones de pasada, es improbable que el proyecto afecte negativamente la calidad del agua.<\/p>\n<p>El r\u00edo Androscoggin no es accesible para <span class='tooltipsall tooltip_post_id_5549 classtoolTips96'>di\u00e1dromo<\/span> fish species in the project reach due to downstream natural falls \u2013 Lewiston and Rumford Falls, in the Maine portion of the river. American eel are present in the lower reaches of the Androscoggin River though none have historically reached the upper sections of the river. The project area supports cold-water fishery habitat. New Hampshire Department of Fish and Game annually stocks brook, rainbow, and brown trout upstream of the project. Resident river species include fallfish, smallmouth bass, white sucker, longnose dace, common shiner, spottail shiner, and yellow perch. Downstream passage can occur by means of spillway flow, low-level gate releases, and power intake flow through the trashracks. The project does not impede the successful completion of resident fish life cycles.<\/p>\n<p>The project lands are limited to the area occupied by project infrastructure. The project is located on the northern edge of the City of Berlin. The east shoreline of the impoundment is bordered by sand and gravel terraces, most of which have been altered by industrial, commercial, and residential development, as well as railroad and bridge construction. The east shoreline of the impoundment is also characterized by low terraces and was altered by the railroad yard, railroad bed, mill yards, and commercial and residential development. The project\u2019s run-of-river operations provides protection of the shoreline areas. The project is also subject to the New Hampshire Shoreland Water Quality Protection Act which governs shoreland uses within a 250-foot buffer of the high-water mark.<\/p>\n<p>Entre las especies amenazadas o en peligro de extinci\u00f3n que podr\u00edan estar presentes en las inmediaciones del proyecto se incluyen el murci\u00e9lago orejudo del norte, el lince canadiense, el murci\u00e9lago tricolor (propuesto para su inclusi\u00f3n en la lista de especies protegidas) y la mariposa monarca. El proyecto evita la tala de \u00e1rboles entre el 15 de abril y el 31 de octubre, salvo que sea necesaria una tala de emergencia por motivos de seguridad p\u00fablica.<\/p>\n<p>The project area does not support any known historic or cultural resources. However, the project operates under a Programmatic Agreement (PA) in consultation with the State Historic Preservation Office. The PA and related Historic Properties Management Plan (HPMP) provides provisions detailing annual monitoring and reporting concerning repair and improvement activities conducted as well as any scheduled activities for the upcoming year.<\/p>\n<p>There are no recreational facilities at the project due to safety concerns, but there are several public facilities in the project vicinity including Heritage Park, Centennial Park, Rotary Park, and the Berlin Riverwalk.<\/p>\n<hr \/>\n<h3>Estado de cumplimiento<\/h3>\n<p><strong>El Certificado incluye las siguientes condiciones espec\u00edficas de la instalaci\u00f3n:<\/strong><\/p>\n<p><strong>Condici\u00f3n 1<\/strong>: The Facility Owner shall submit the final Operational Compliance Monitoring Plan (OCMP) to LIHI once it has been approved by resource agencies and FERC. \u00a0In annual compliance submittals to LIHI the Facility Owner shall submit a summary of all planned and unplanned operational deviations that occurred during the year along with evidence of resource agency consultation and comments received.<\/p>\n<p><strong>Condici\u00f3n 2<\/strong>: The Facility Owner shall submit the final Historic Properties Management Plan to LIHI once it has been approved by the SHPO and FERC. In annual compliance submittals to LIHI, the Facility Owner shall report on any consultation that occurred during the year related to ground-disturbing or other activities subject to the HPMP.<\/p>\n<p><strong>Condici\u00f3n 3<\/strong>: The Facility Owner shall work with the City of Berlin on implementation of the proposed enhancements at Horne Field (a.k.a. Centennial Park) to develop an ADA parking space, a path, a landing area with bench, and signage; and report to LIHI on the status of the modifications in annual compliance submittals until all enhancements are completed.<\/p>\n<p><strong>2026:<\/strong> La presentaci\u00f3n de informes anuales para el Certificado actual a\u00fan no ha entrado en vigor.<\/p>\n<hr \/>\n<h3>Historial de certificaciones<\/h3>\n<p><strong>27 de octubre de 2026:<\/strong> The Low Impact Hydropower Institute has issued a final decision on Low Impact recertification for the Sawmill Hydroelectric Project. The preliminary decision was issued on August 18, 2026 starting the 30-day appeal window. That window closed on September 17, 2026 and no appeals were filed. Therefore, the decision to recertify the project is now final. The certification term is August 31, 2026 &#8211; August 30, 2036.<\/p>\n<p><strong>18 de agosto de 2026:<\/strong> El Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto ha aprobado preliminarmente la recertificaci\u00f3n de bajo impacto para el Proyecto Hidroel\u00e9ctrico Sawmill. Las solicitudes de revisi\u00f3n intermedia y el informe del revisor est\u00e1n disponibles a continuaci\u00f3n. La certificaci\u00f3n incluye tres condiciones, recogidas en el informe de revisi\u00f3n, para garantizar el cumplimiento oportuno de las medidas de implementaci\u00f3n de la renovaci\u00f3n de la licencia de la FERC.<\/p>\n<p>La decisi\u00f3n es preliminar a la espera del plazo de apelaci\u00f3n de 30 d\u00edas. Solo quienes hayan presentado comentarios sobre la solicitud inicial durante el per\u00edodo de comentarios de 60 d\u00edas podr\u00e1n interponer una apelaci\u00f3n. Dicha apelaci\u00f3n deber\u00e1 incluir una explicaci\u00f3n de por qu\u00e9 el Proyecto no cumple con los criterios de LIHI. Las solicitudes de apelaci\u00f3n pueden enviarse por correo electr\u00f3nico a <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> Env\u00ede su solicitud con el asunto \u201cProyecto Aserradero\u201d o por correo postal a Low Impact Hydropower Institute, 68 Harrison Ave Ste 605, PMB 113938 Boston, Massachusetts 02111-1929. Todas las solicitudes se publicar\u00e1n en el sitio web. El solicitante tendr\u00e1 la oportunidad de responder, y cualquier respuesta tambi\u00e9n se publicar\u00e1. <strong>Las solicitudes deben recibirse antes de las 5 de la tarde, hora del este, del 17 de septiembre de 2026. <\/strong>Si no se reciben solicitudes de apelaci\u00f3n, el nuevo per\u00edodo de certificaci\u00f3n ser\u00e1 del 31 de agosto de 2026 al 30 de agosto de 2036.<\/p>\n<p><strong>28 de abril de 2026: <\/strong>The Low Impact Hydropower Institute has received a complete application for a mid-term review of the Sawmill Project. The Project is one of several LIHI Certified projects located on the upper Androscoggin River in New Hampshire that were issued new FERC licenses in September 2025. In accordance with Section 5.3.4 of the 2nd Edition LIHI Handbook, issuance of a new license constitutes a \u201cmaterial change\u201d and triggers a mid-term LIHI Certification review. LIHI is seeking public comment on this application. Specifically, we are interested in knowing whether you think the Project continues to meet the LIHI Low Impact Certification Criteria, as revised in the 2nd Edition Handbook. Comments that are directly tied to specific LIHI criteria (flows, water quality, <span class='tooltipsall tooltip_post_id_5566 classtoolTips59'>paso de peces<\/span>, etc.) ser\u00e1n de gran ayuda, pero se tendr\u00e1n en cuenta todos los comentarios. Los comentarios pueden enviarse a LIHI por correo electr\u00f3nico a <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> con \u201cComentarios sobre el aserradero\u201d en el asunto, o por correo postal dirigido al Low Impact Hydropower Institute, 68 Harrison Ave. Ste 605, PMB 113938, Boston MA 02111-1929.\u00a0<strong>Los comentarios deben recibirse antes de las 5 de la tarde, hora del este, del 27 de junio de 2026 para ser tenidos en cuenta. <\/strong>Todos los comentarios se publicar\u00e1n en el sitio web y los solicitantes tendr\u00e1n la oportunidad de responder. Cualquier respuesta tambi\u00e9n se publicar\u00e1.<\/p>\n<p><strong>1 de enero de 2022:<\/strong> El plazo del Certificado LIHI se ha extendido de acuerdo con la Revisi\u00f3n 2.05 del Manual de Certificaci\u00f3n LIHI 2.\u00aa Edici\u00f3n emitido el 1 de enero de 2022. Consulte la tabla de instalaciones anterior para conocer el nuevo plazo.<\/p>\n<p><strong>30 de noviembre de 2020:<\/strong> La decisi\u00f3n de certificar el Proyecto Aserradero qued\u00f3 firme tras el cierre del plazo de apelaciones el 27 de noviembre de 2020, sin que se presentaran apelaciones. El plazo de certificaci\u00f3n es del 31 de agosto de 2020 al 30 de agosto de 2025.<\/p>\n<p><strong>27 de octubre de 2020:<\/strong>El Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto (LIHI) aprob\u00f3 preliminarmente la Certificaci\u00f3n de Bajo Impacto para los Proyectos Hidroel\u00e9ctricos Sawmill, Cross Power, Upper Gorham y Shelburne, ubicados en el r\u00edo Androscoggin, New Hampshire. Esta decisi\u00f3n es preliminar, a la espera del plazo de apelaci\u00f3n de 30 d\u00edas. Solo quienes comentaron sobre la solicitud inicial durante el plazo de 60 d\u00edas pueden presentar una apelaci\u00f3n. Dicha apelaci\u00f3n debe incluir una explicaci\u00f3n de por qu\u00e9 el Proyecto no cumple con los criterios del LIHI. Las solicitudes de apelaci\u00f3n para uno o m\u00e1s de estos proyectos pueden enviarse por correo electr\u00f3nico a <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> Con el asunto &quot;Proyectos del r\u00edo Androscoggin-NH&quot;, o por correo postal dirigido al Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto, 329 Massachusetts Ave, Suite 6, Lexington, MA 02420. Todas las solicitudes se publicar\u00e1n en el sitio web. El solicitante tendr\u00e1 la oportunidad de responder, y cualquier respuesta tambi\u00e9n se publicar\u00e1. <strong>Las solicitudes deben recibirse antes de las 5 p. m., hora del Este, del 27 de noviembre de 2020. <\/strong>La solicitud completa y el informe de revisi\u00f3n est\u00e1n disponibles a continuaci\u00f3n. Si no se reciben solicitudes de apelaci\u00f3n, el per\u00edodo de certificaci\u00f3n para cada proyecto ser\u00e1 del 31 de agosto de 2020 al 30 de agosto de 2025.<\/p>\n<p><strong>13 de agosto de 2020:<\/strong> El Instituto de Energ\u00eda Hidroel\u00e9ctrica de Bajo Impacto (LIHI) ha recibido una solicitud completa para la Certificaci\u00f3n de Bajo Impacto de los proyectos hidroel\u00e9ctricos Sawmill, Cross Power, Upper Gorham y Shelburne, ubicados en el r\u00edo Androscoggin en New Hampshire. LIHI solicita comentarios del p\u00fablico sobre esta solicitud. Espec\u00edficamente, nos interesa saber si usted considera que los proyectos cumplen con los Criterios de Certificaci\u00f3n de Bajo Impacto de LIHI, seg\u00fan la revisi\u00f3n de la 2.\u00aa edici\u00f3n del Manual. La solicitud se encuentra disponible a continuaci\u00f3n. Los comentarios directamente relacionados con criterios espec\u00edficos de LIHI (caudales, calidad del agua, paso de peces, etc.) ser\u00e1n de gran utilidad, pero se considerar\u00e1n todos los comentarios. Los comentarios pueden enviarse al Instituto por correo electr\u00f3nico a <a href=\"mailto:comments@lowimpacthydro.org\">comments@lowimpacthydro.org<\/a> con \u201cComentarios sobre el Proyecto Androscoggin River-NH\u201d en la l\u00ednea de asunto, o por correo dirigido al Low Impact Hydropower Institute, 329 Massachusetts Avenue, Suite 6, Lexington, MA 02420. <strong>Los comentarios deben recibirse antes de las 5 p. m., hora del Este, el 12 de octubre de 2020 para ser considerados.<\/strong> Todos los comentarios se publicar\u00e1n en el sitio web y el solicitante tendr\u00e1 la oportunidad de responder. Las respuestas tambi\u00e9n se publicar\u00e1n.<\/p>\n<hr \/>\n<h3>Archivos de certificaci\u00f3n<\/h3>\n<h4>Revisi\u00f3n de mitad de per\u00edodo de 2026<\/h4>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/10\/Mid-Term-Review-Sawmill-Hydroelectric-Project-7626-final.pdf\">Informe de revisi\u00f3n intermedia del aserradero<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20260203-Upper-Andro-LIHI-Mid-Term-Review-Application.pdf\">Solicitud de revisi\u00f3n intermedia del r\u00edo Alto Androscoggin<\/a><\/li>\n<\/ul>\n<h4>Certificaci\u00f3n 2020<\/h4>\n<ul style=\"color: black;\">\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/11\/Berlin-NH-Projects-Certification-Review-2020.pdf\">Revisi\u00f3n de la certificaci\u00f3n de proyectos de NH en Berl\u00edn 2020<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2020\/12\/20200831-Berlin-NH-Revised-LIHI-Application.pdf\">Solicitud de certificaci\u00f3n de proyectos de Berl\u00edn NH 2020<\/a><\/li>\n<\/ul>\n<hr \/>\n<h3>Documentos clave<\/h3>\n<ul>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20250909-Sawmill-FERC-license-and-WQC.pdf\">Licencia FERC y certificado de calidad del agua para aserradero (2025)<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/04\/20241007-Sawmill-FEA-final.pdf\">Evaluaci\u00f3n ambiental de la FERC para el aserradero en 2024<\/a><\/li>\n<li><a href=\"https:\/\/lowimpacthydro.org\/wp-content\/uploads\/2026\/06\/20220801-5028_GLHA-Volume-II-FLA.pdf\">Solicitud de licencia final de Great Lake Hydro America 2022, Anexo E<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Project Name Sawmill LIHI Certificate No. 173 LIHI Certificate Term August 31, 2026 &#8211; August 30, 2036 Owner Great Lakes Hydro America, LLC, a subsidiary of<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":3,"featured_media":-1,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"class_list":["post-3743","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/pages\/3743","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/comments?post=3743"}],"version-history":[{"count":17,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/pages\/3743\/revisions"}],"predecessor-version":[{"id":10978,"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/pages\/3743\/revisions\/10978"}],"wp:attachment":[{"href":"https:\/\/lowimpacthydro.org\/es\/wp-json\/wp\/v2\/media?parent=3743"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}