Harrington Park, New Jersey (June 17, 2016) – LIHI Executive Director Michael J. Sale, using authority delegated from the LIHI Governing Board, has issued a Preliminary Certification Decision that the Penacook Upper Hydroelectric Project (FERC No. P-6689) satisfies the LIHI Certification Criteria.  This Preliminary Certification Decision includes two facility-specific conditions, as follows:

  • Condition 1.  The facility owner shall consult with NHDES to determine the most appropriate and efficient way to report on minimum flows and pond level fluctuations, then, after reaching agreement with NHDES on best methods, complete the subject summary report on or before the end of December 2016. The owner shall provide a copy of this report to LIHI along with all related correspondence.
  • Condition 2.  Within 30 days after LIHI recertification, the facility owner shall complete consultation with the NHDES to finalize the details of an alternative approach for spot testing the current water quality conditions at the facility. The owner shall provide LIHI with all related correspondence pertaining to resolution of this issue and with the water quality data once testing has been completed.  The owner shall complete the water quality testing before the end of December 2016, weather permitting.

As provided for in Section 4.2.5 of the LIHI 2nd Edition, the Preliminary Certification Decision to certify, along with the Application Reviewer’s report and (if prepared) report of the Executive Director, will be posted on the Institute’s Web page for 30 days.  Notice of the posting will be provided to all individuals or organizations that commented on the initial Application Package.

Any Commenter may submit a letter to the Executive Director requesting an appeal within the 30-day period.  The appeal request must state specific reasons why the hydropower facility should have failed one or more criteria.  If an individual or organization did not comment on the initial Application Package, they may not file an appeal.  Further information about the LIHI appeal process is available in the LIHI Handbook, available at http://lowimpacthydro.org/certification-program-html/.

If no appeal is requested within the 30-day period, the Executive Director will issue LIHI Certification for the facility and post a notification of certification on the Institute’s website.  Once final, the effective certification date for the Penacook Upper Project is September 25, 2014 for a five (5) year term, which will expire on September 25, 2019.